Completion Progress

Completed in 2026-2027
5,16,720
— started this same FY
42,283
8%
— started in an earlier FY
4,74,437
92% — carried over
Physically done, closure pending (statewide)
4,57,701
This period's completions, by original start year
2025-2026
3,10,485
2024-2025
82,478
2026-2027
42,283
2023-2024
36,358
2022-2023
14,224
2021-2022
14,120
Completions by month, FY 2026-2027
Mar
Apr
May
Jun
Jul
Aug
Sep

Detailed breakdown

By District By New Work Type
Sr. New Work Type Completed this period — started same FY — carried over
1 Rural Housing 2,88,880 41,608 2,47,272
2 Well Recharge 51,956 14 51,942
3 Farm Pond 50,363 78 50,285
4 Plantation 24,156 2 24,154
5 Construction of Bund 12,998 32 12,966
6 Construction of Well 11,365 32 11,333
7 Construction of Tank 11,226 70 11,156
8 Construction of Recharge Pits 9,496 14 9,482
9 Construction of Check Dam/Stop Dam 8,748 63 8,685
10 Constr of Cement Concrete Roads 6,466 163 6,303
11 Construction of Percolation Tank 6,254 13 6,241
12 Construction of Trench 4,763 20 4,743
13 Land Development 4,734 6 4,728
14 Repair & maint of Pond/ Tank 2,579 2 2,577
15 Solid and Liquid Waste Management 2,373 32 2,341
16 Cattle Shed 2,131 63 2,068
17 Construction of Road and Culvert 1,801 6 1,795
18 Construction of NADEP/Vermi Compost Pit 1,793 5 1,788
19 Constr of Gabion 1,256 0 1,256
20 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1,092 2 1,090
21 Roof Water Harvesting on gov/panchayat bldg 1,031 14 1,017
22 Boulder Check/Gully Plug 938 3 935
23 Works for Flood Control and Protection 782 3 779
24 Constr of Aganwadi 773 7 766
25 Constr of GP Bhawan 677 1 676
26 Construction of Crematorium 622 7 615
27 Grass Land Development 560 0 560
28 Community Sanitary Complex 555 5 550
29 Culvert 553 5 548
30 Terracing 496 0 496
31 Constr of Compound wall 413 1 412
32 Nursery Development 403 1 402
33 Repair & maint of Road 350 0 350
34 Repair & maint of Water Harvesting Structures 329 0 329
35 Repair & Maint of Check Dam/Stop Dam 307 0 307
36 Repair & maint of Percolation Tank 286 0 286
37 Construction of Toilets 236 0 236
38 Construction of Fish Drying Infrastructure 233 0 233
39 Construction of Canal 217 4 213
40 Construction of building/workshed for SHG 213 3 210
41 Construction of Embankment 203 0 203
42 Goat Shelter 195 1 194
43 Underground Dyke for Ground Water Recharge 192 0 192
44 Other Works 191 0 191
45 Construction of Play field 185 0 185
46 Constr of Food Grain storage 178 0 178
47 Poultry Shelter 177 1 176
48 Bio-Fertilizer 169 1 168
49 Repair & Maint of Bund 162 0 162
50 Repair & Maint of Community infrastructure 106 0 106
51 Construction of Spur 100 0 100
52 Constr of Kitchen Shed 96 0 96
53 Repaire and Maint of NADEP/Vermi Compost Pit 70 0 70
54 Lining of Canal 67 0 67
55 Renovation of Canal 66 0 66
56 Construction of Other Community Building/Assets 54 0 54
57 Repair & Maint of Canal 37 0 37
58 Construction of Village Haats 23 0 23
59 Piggery Shelter 13 0 13
60 Bio-gas plant 13 0 13
61 Renovation of traditional water bodies 9 0 9
62 Repair & maint of Gully Plugs 4 0 4
63 Repair & Maint of Fish Drying Infrastructure 3 0 3
64 Lift Irrigation 2 0 2
65 (uncategorised) 1 1 0
Total 5,16,720 42,283 4,74,437
All 65 rows (zero-value rows hidden) ⇩ Export to Excel