MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Completion Progress

Completed in 2026-2027
5,26,982
— started this same FY
47,192
9%
— started in an earlier FY
4,79,790
91% — carried over
Physically done, closure pending (statewide)
4,64,460
This period's completions, by original start year
2025-2026
3,14,231
2024-2025
83,768
2026-2027
47,192
2023-2024
36,479
2022-2023
14,289
2021-2022
14,172
Completions by month, FY 2026-2027
Mar
Apr
May
Jun
Jul
Aug
Sep

Detailed breakdown

By District By New Work Type
Sr. New Work Type Completed this period — started same FY — carried over
1 Rural Housing 2,98,731 46,508 2,52,223
2 Well Recharge 51,966 14 51,952
3 Farm Pond 50,380 81 50,299
4 Plantation 24,242 2 24,240
5 Construction of Bund 13,005 32 12,973
6 Construction of Well 11,462 32 11,430
7 Construction of Tank 11,233 70 11,163
8 Construction of Recharge Pits 9,497 14 9,483
9 Construction of Check Dam/Stop Dam 8,758 66 8,692
10 Constr of Cement Concrete Roads 6,546 163 6,383
11 Construction of Percolation Tank 6,257 13 6,244
12 Construction of Trench 4,765 21 4,744
13 Land Development 4,737 6 4,731
14 Repair & maint of Pond/ Tank 2,582 2 2,580
15 Solid and Liquid Waste Management 2,384 34 2,350
16 Cattle Shed 2,151 63 2,088
17 Construction of Road and Culvert 1,812 6 1,806
18 Construction of NADEP/Vermi Compost Pit 1,798 5 1,793
19 Constr of Gabion 1,257 0 1,257
20 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1,092 2 1,090
21 Roof Water Harvesting on gov/panchayat bldg 1,031 14 1,017
22 Boulder Check/Gully Plug 939 3 936
23 Works for Flood Control and Protection 785 3 782
24 Constr of Aganwadi 777 7 770
25 Constr of GP Bhawan 685 1 684
26 Construction of Crematorium 625 7 618
27 Grass Land Development 560 0 560
28 Community Sanitary Complex 557 5 552
29 Culvert 554 5 549
30 Terracing 497 0 497
31 Constr of Compound wall 414 1 413
32 Nursery Development 403 1 402
33 Repair & maint of Road 351 0 351
34 Repair & maint of Water Harvesting Structures 329 0 329
35 Repair & Maint of Check Dam/Stop Dam 307 0 307
36 Repair & maint of Percolation Tank 286 0 286
37 Construction of Toilets 239 0 239
38 Construction of Fish Drying Infrastructure 233 0 233
39 Construction of Canal 217 4 213
40 Construction of building/workshed for SHG 214 3 211
41 Construction of Embankment 205 0 205
42 Goat Shelter 197 1 196
43 Underground Dyke for Ground Water Recharge 193 0 193
44 Other Works 191 0 191
45 Construction of Play field 186 0 186
46 Constr of Food Grain storage 178 0 178
47 Poultry Shelter 178 1 177
48 Bio-Fertilizer 169 1 168
49 Repair & Maint of Bund 162 0 162
50 Repair & Maint of Community infrastructure 107 0 107
51 Construction of Spur 100 0 100
52 Constr of Kitchen Shed 96 0 96
53 Repaire and Maint of NADEP/Vermi Compost Pit 70 0 70
54 Lining of Canal 67 0 67
55 Renovation of Canal 66 0 66
56 Construction of Other Community Building/Assets 54 0 54
57 Repair & Maint of Canal 37 0 37
58 Construction of Village Haats 23 0 23
59 Bio-gas plant 13 0 13
60 Piggery Shelter 13 0 13
61 Renovation of traditional water bodies 9 0 9
62 Repair & maint of Gully Plugs 4 0 4
63 Repair & Maint of Fish Drying Infrastructure 3 0 3
64 Lift Irrigation 2 0 2
65 (uncategorised) 1 1 0
Total 5,26,982 47,192 4,79,790
All 65 rows (zero-value rows hidden) ⇩ Export to Excel