| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 357 | 3 | 347 | 0 | 67.47 | 64.72 | 96% |
| 2 | Construction of Bund | 119 | 0 | 96 | 19 | 26.69 | 19.83 | 74% |
| 3 | Construction of Check Dam/Stop Dam | 113 | 0 | 96 | 0 | 45.20 | 41.23 | 91% |
| 4 | Construction of Toilets | 79 | 0 | 72 | 0 | 5.45 | 4.45 | 82% |
| 5 | Construction of Trench | 55 | 0 | 55 | 0 | 2.55 | 15.04 | 590% |
| 6 | Farm Pond | 43 | 0 | 23 | 2 | 30.68 | 28.56 | 93% |
| 7 | Construction of Road and Culvert | 35 | 0 | 24 | 0 | 68.82 | 91.05 | 132% |
| 8 | Constr of Cement Concrete Roads | 29 | 1 | 14 | 8 | 23.49 | 10.57 | 45% |
| 9 | Works for Flood Control and Protection | 15 | 0 | 9 | 2 | 66.04 | 56.49 | 86% |
| 10 | Construction of Tank | 14 | 0 | 5 | 7 | 22.82 | 16.14 | 71% |
| 11 | Construction of building/workshed for SHG | 9 | 0 | 0 | 1 | 6.40 | 0.09 | 1% |
| 12 | Solid and Liquid Waste Management | 7 | 0 | 4 | 3 | 0.30 | 0.20 | 67% |
| 13 | Construction of NADEP/Vermi Compost Pit | 6 | 0 | 5 | 0 | 1.13 | 0.66 | 59% |
| 14 | Land Development | 6 | 0 | 5 | 0 | 0.00 | 0.40 | 0% |
| 15 | Renovation of traditional water bodies | 6 | 0 | 4 | 0 | 20.00 | 15.68 | 78% |
| 16 | Plantation | 5 | 0 | 2 | 2 | 7.00 | 0.90 | 13% |
| 17 | Culvert | 4 | 0 | 2 | 0 | 9.18 | 4.97 | 54% |
| 18 | Construction of Fish Drying Infrastructure | 4 | 0 | 2 | 0 | 17.04 | 13.84 | 81% |
| 19 | Fish Culture | 4 | 0 | 4 | 0 | 17.99 | 11.83 | 66% |
| 20 | Repair & maint of Pond/ Tank | 4 | 0 | 4 | 0 | 29.78 | 21.96 | 74% |
| 21 | Well Recharge | 4 | 0 | 0 | 0 | 0.78 | 0.73 | 93% |
| 22 | Cattle Shed | 2 | 0 | 0 | 0 | 0.53 | 0.00 | 0% |
| 23 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 2 | 0 | 1 | 0 | 13.19 | 11.87 | 90% |
| 24 | Construction of Recharge Pits | 2 | 0 | 0 | 0 | 4.10 | 0.00 | 0% |
| 25 | Deepening / Desilting of Flood Channels | 2 | 0 | 2 | 0 | 13.92 | 17.16 | 123% |
| 26 | Roof Water Harvesting on gov/panchayat bldg | 2 | 0 | 1 | 0 | 0.05 | 0.05 | 95% |
| 27 | Construction of Embankment | 1 | 0 | 1 | 0 | 8.62 | 7.35 | 85% |
| 28 | Repair & Maint of Community infrastructure | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 29 | Terracing | 1 | 0 | 1 | 0 | 3.35 | 0.36 | 11% |
| Total | 931 | 4 | 779 | 44 | 512.58 | 456.14 |