MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 4,413 66 3,993 60 7.88 6.73
85%
2 Cattle Shed 3,471 2 1,767 116 23.62 13.17
56%
3 Plantation 2,840 160 1,152 906 137.52 102.73
75%
4 Construction of Road and Culvert 2,641 12 1,253 104 112.63 71.19
63%
5 Construction of Check Dam/Stop Dam 2,561 34 1,349 584 163.80 140.41
86%
6 Farm Pond 2,232 22 1,712 61 11.92 11.60
97%
7 Construction of Toilets 1,910 0 615 6 0.67 0.34
50%
8 Construction of Tank 1,794 295 329 253 139.80 105.60
76%
9 Construction of Bund 1,544 308 335 254 111.03 77.97
70%
10 Works for Flood Control and Protection 1,395 37 625 178 90.91 64.56
71%
11 Land Development 1,185 36 727 39 14.91 10.37
70%
12 Constr of Cement Concrete Roads 774 2 419 87 23.00 7.08
31%
13 Construction of Trench 605 25 225 99 38.37 28.47
74%
14 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 297 9 141 66 22.73 18.14
80%
15 Boulder Check/Gully Plug 292 12 111 101 14.56 10.37
71%
16 Construction of Percolation Tank 250 3 110 50 11.48 8.70
76%
17 Construction of Recharge Pits 210 3 126 19 2.83 2.28
81%
18 Repair & maint of Pond/ Tank 199 2 99 58 10.76 8.56
80%
19 Repair & Maint of Check Dam/Stop Dam 191 4 111 47 15.21 12.95
85%
20 Well Recharge 164 1 69 30 2.76 2.34
85%
21 Construction of NADEP/Vermi Compost Pit 153 1 51 65 1.47 0.92
63%
22 Construction of Crematorium 143 12 65 10 2.92 1.97
68%
23 Repair & maint of Water Harvesting Structures 132 5 57 44 9.17 6.93
76%
24 Terracing 125 5 55 42 10.12 7.59
75%
25 Community Sanitary Complex 113 1 63 16 0.45 0.28
61%
26 Construction of Well 106 4 51 3 0.95 0.61
65%
27 Renovation of traditional water bodies 91 0 38 9 2.29 0.88
38%
28 Deepening / Desilting of Flood Channels 83 0 31 0 1.51 1.18
78%
29 Construction of Embankment 81 5 46 12 6.90 5.21
76%
30 Constr of Gabion 81 5 42 25 7.13 5.88
82%
31 Construction of Spur 78 4 45 15 9.35 8.10
87%
32 Constr of Aganwadi 74 6 27 18 1.41 0.82
58%
33 Constr of GP Bhawan 71 8 32 6 4.90 2.73
56%
34 Repair & maint of Road 70 4 23 23 5.16 4.49
87%
35 Repair & Maint of Community infrastructure 66 1 10 1 0.79 0.40
51%
36 Solid and Liquid Waste Management 66 2 7 19 0.58 0.23
40%
37 Construction of Play field 62 0 32 3 1.18 0.64
54%
38 Roof Water Harvesting on gov/panchayat bldg 61 1 18 9 1.41 0.87
62%
39 Nursery Development 44 3 9 8 2.18 0.29
13%
40 Repair & maint of Percolation Tank 43 0 22 16 2.84 2.54
89%
41 Construction of Other Community Building/Assets 36 0 6 2 0.69 0.30
43%
42 Underground Dyke for Ground Water Recharge 33 0 15 4 2.82 2.54
90%
43 Culvert 32 0 5 1 0.33 0.15
46%
44 Constr of Food Grain storage 30 2 6 10 0.91 0.18
19%
45 Repair & Maint of Bund 30 0 16 8 2.08 1.75
84%
46 Strengthening of Embankment 29 0 15 0 1.74 1.46
84%
47 Lining of Canal 27 1 0 3 0.15 0.13
87%
48 Construction of Canal 24 1 2 5 0.25 0.12
48%
49 Construction of Fish Drying Infrastructure 15 0 11 1 0.18 0.13
72%
50 Grass Land Development 15 0 5 4 0.52 0.30
57%
51 Constr of Compound wall 10 0 3 6 0.11 0.07
68%
52 Other Works 10 1 6 1 0.08 0.05
68%
53 Construction of building/workshed for SHG 9 0 3 3 0.07 0.06
93%
54 Bio-Fertilizer 7 1 2 0 0.07 0.04
62%
55 Poultry Shelter 6 1 3 2 0.08 0.07
92%
56 Goat Shelter 6 0 2 2 0.53 0.51
96%
57 Repaire and Maint of NADEP/Vermi Compost Pit 6 0 1 4 0.13 0.00
1%
58 Bio-gas plant 5 1 0 0 0.03 0.00
2%
59 Piggery Shelter 4 0 2 2 0.40 0.38
95%
60 Construction of Village Haats 2 1 0 1 0.07 0.03
43%
61 Renovation of Canal 2 0 0 2 0.15 0.00
0%
62 Lift Irrigation 2 0 0 1 0.00 0.00
0%
63 Constr of Kitchen Shed 1 0 0 0 0.03 0.00
0%
64 Repair & maint of Gully Plugs 1 0 0 1 0.00 0.00
0%
Total 31,053 1,109 16,095 3,525 1,040.52 764.38