MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 21,784 885 19,560 112 39.87 36.12
91%
2 Construction of Bund 3,661 30 2,039 1,074 16.72 10.03
60%
3 Construction of Check Dam/Stop Dam 2,365 27 2,031 203 37.02 25.44
69%
4 Constr of Cement Concrete Roads 2,286 162 1,651 178 18.98 13.23
70%
5 Farm Pond 2,256 137 893 613 41.86 20.77
50%
6 Construction of Toilets 1,698 20 751 506 1.84 0.79
43%
7 Plantation 1,028 199 215 322 18.26 2.58
14%
8 Construction of Road and Culvert 978 9 652 72 53.96 21.02
39%
9 Construction of Well 931 42 383 205 19.24 11.18
58%
10 Well Recharge 900 25 638 8 8.62 4.92
57%
11 Construction of NADEP/Vermi Compost Pit 883 3 205 615 0.65 0.19
29%
12 Cattle Shed 869 96 213 293 9.21 7.17
78%
13 Solid and Liquid Waste Management 480 29 147 269 1.29 0.75
58%
14 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 324 0 266 7 2.17 1.07
49%
15 Construction of Tank 222 18 39 108 5.86 2.57
44%
16 Renovation of traditional water bodies 190 0 145 1 7.91 4.12
52%
17 Repair & maint of Pond/ Tank 186 5 82 67 4.43 2.80
63%
18 Construction of Crematorium 171 12 85 18 3.88 2.17
56%
19 Construction of Trench 129 0 77 37 0.34 0.21
60%
20 Land Development 127 0 53 36 1.26 0.52
42%
21 Construction of Play field 114 5 61 11 3.22 1.30
41%
22 Culvert 96 10 55 19 0.87 0.56
64%
23 Constr of Aganwadi 73 20 35 12 1.27 0.86
68%
24 Community Sanitary Complex 71 10 53 3 0.38 0.26
68%
25 Boulder Check/Gully Plug 65 0 43 22 0.25 0.14
57%
26 Constr of Compound wall 64 7 40 8 0.86 0.71
83%
27 Construction of Recharge Pits 59 11 9 10 0.13 0.03
21%
28 Constr of Gabion 57 1 15 33 0.58 0.44
76%
29 Roof Water Harvesting on gov/panchayat bldg 34 0 4 25 0.04 0.01
13%
30 Construction of building/workshed for SHG 32 2 9 10 1.04 0.33
32%
31 Constr of GP Bhawan 29 2 17 6 1.99 1.29
65%
32 Repair & maint of Road 27 0 18 6 0.47 0.35
75%
33 Repaire and Maint of NADEP/Vermi Compost Pit 25 0 5 20 0.02 0.01
30%
34 Repair & Maint of Community infrastructure 22 1 18 0 1.43 1.00
70%
35 Underground Dyke for Ground Water Recharge 22 0 19 1 0.03 0.02
61%
36 Construction of Percolation Tank 20 0 2 17 0.05 0.00
2%
37 Construction of Village Haats 16 0 12 0 0.22 0.21
93%
38 Construction of Spur 15 1 2 12 0.07 0.03
51%
39 Grass Land Development 10 3 0 5 0.48 0.09
18%
40 Constr of Food Grain storage 8 1 0 2 0.08 0.00
5%
41 Goat Shelter 8 0 1 4 0.04 0.02
38%
42 Terracing 8 0 1 6 0.03 0.01
27%
43 Constr of Kitchen Shed 7 0 3 3 0.00 0.00
54%
44 Works for Flood Control and Protection 6 1 4 0 0.28 0.13
48%
45 Repair & Maint of Check Dam/Stop Dam 5 0 1 4 0.15 0.15
96%
46 Bio-Fertilizer 5 0 3 0 0.05 0.01
20%
47 Poultry Shelter 4 0 0 1 0.01 0.00
0%
48 Construction of Canal 3 0 0 2 0.06 0.00
0%
49 Nursery Development 3 0 1 1 0.09 0.00
2%
50 Other Works 3 0 1 1 0.02 0.00
8%
51 Repair & Maint of Bund 2 0 2 0 0.02 0.02
93%
52 Piggery Shelter 2 0 0 2 0.00 0.00
0%
53 Repair & maint of Percolation Tank 2 0 0 2 0.00 0.00
0%
54 Construction of Fish Drying Infrastructure 1 0 0 0 0.01 0.00
0%
55 Deepening / Desilting of Flood Channels 1 0 1 0 0.05 0.03
56%
56 Construction of Other Community Building/Assets 1 0 0 1 0.08 0.00
0%
57 Bio-gas plant 1 0 0 0 0.00 0.00
0%
58 Fish Culture 1 0 0 0 0.00 0.00
0%
Total 42,390 1,774 30,560 4,993 307.76 175.64
All 58 rows (zero-value rows hidden) ⇩ Export to Excel