MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 21,630 1,487 17,882 256 37.93 31.22
82%
2 Farm Pond 8,653 154 5,188 511 51.62 31.78
62%
3 Construction of Bund 4,674 39 2,315 1,415 55.05 35.11
64%
4 Solid and Liquid Waste Management 2,871 39 1,117 1,337 5.33 2.43
46%
5 Construction of Check Dam/Stop Dam 2,492 68 1,626 358 87.45 39.35
45%
6 Land Development 2,319 6 1,399 217 12.11 6.70
55%
7 Constr of Cement Concrete Roads 1,824 91 1,289 139 23.61 16.15
68%
8 Plantation 1,607 147 779 312 34.51 8.53
25%
9 Construction of Road and Culvert 1,462 32 908 198 61.39 28.72
47%
10 Construction of Well 1,248 27 904 123 24.64 13.55
55%
11 Construction of Tank 1,180 32 483 408 52.64 36.88
70%
12 Construction of Toilets 1,025 1 905 23 1.39 0.83
60%
13 Construction of Trench 724 22 300 291 22.86 13.16
58%
14 Cattle Shed 674 6 333 110 6.20 3.09
50%
15 Boulder Check/Gully Plug 646 9 248 294 15.90 10.08
63%
16 Constr of Gabion 611 20 202 307 7.40 4.58
62%
17 Construction of Percolation Tank 499 15 124 125 7.29 4.15
57%
18 Culvert 435 31 310 64 3.26 2.28
70%
19 Construction of NADEP/Vermi Compost Pit 385 6 88 118 0.67 0.27
40%
20 Construction of Recharge Pits 339 3 103 134 1.17 0.38
32%
21 Well Recharge 320 18 61 21 1.29 0.96
75%
22 Repair & maint of Pond/ Tank 265 7 156 68 7.91 5.90
75%
23 Construction of Crematorium 260 16 122 17 3.65 1.73
47%
24 Constr of GP Bhawan 216 26 99 47 7.30 3.53
48%
25 Constr of Aganwadi 201 16 86 48 3.64 2.12
58%
26 Constr of Compound wall 186 12 123 22 2.29 1.40
61%
27 Goat Shelter 178 3 92 20 0.95 0.38
40%
28 Construction of Play field 147 1 65 44 2.58 1.40
54%
29 Roof Water Harvesting on gov/panchayat bldg 114 1 63 33 0.48 0.24
50%
30 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 104 4 43 32 1.23 0.59
48%
31 Repair & Maint of Community infrastructure 81 1 61 12 1.05 0.68
65%
32 Repair & maint of Water Harvesting Structures 79 0 31 35 1.26 0.65
51%
33 Community Sanitary Complex 73 8 46 11 0.43 0.26
61%
34 Terracing 65 1 14 27 0.49 0.19
39%
35 Repair & Maint of Check Dam/Stop Dam 52 2 20 24 0.67 0.48
72%
36 Poultry Shelter 51 0 22 15 0.30 0.13
43%
37 Constr of Food Grain storage 41 0 15 16 1.43 0.60
42%
38 Renovation of traditional water bodies 36 0 32 1 2.43 1.24
51%
39 Repair & Maint of Bund 31 1 9 17 0.55 0.37
66%
40 Repair & maint of Road 31 1 5 22 0.49 0.32
65%
41 Construction of Spur 29 1 13 9 0.76 0.54
71%
42 Construction of Other Community Building/Assets 23 1 10 8 0.40 0.27
69%
43 Construction of Canal 19 0 0 2 0.11 0.07
63%
44 Works for Flood Control and Protection 18 0 12 0 1.45 0.91
63%
45 Constr of Kitchen Shed 15 0 6 9 0.06 0.05
72%
46 Repair & maint of Percolation Tank 12 0 3 3 0.35 0.21
61%
47 Underground Dyke for Ground Water Recharge 9 0 4 2 0.07 0.07
89%
48 Piggery Shelter 9 1 1 3 0.09 0.02
26%
49 Nursery Development 7 0 3 1 0.12 0.01
10%
50 Construction of building/workshed for SHG 6 2 0 1 0.11 0.03
26%
51 Other Works 5 0 1 3 0.00 0.00
36%
52 Construction of Fish Drying Infrastructure 5 0 3 1 0.10 0.09
92%
53 Grass Land Development 5 2 0 3 0.15 0.02
12%
54 Bio-Fertilizer 5 1 1 0 0.05 0.03
63%
55 Construction of Embankment 4 0 1 2 0.01 0.01
94%
56 Deepening / Desilting of Flood Channels 2 0 1 0 0.06 0.00
6%
57 Strengthening of Embankment 2 0 2 0 0.11 0.08
75%
58 Repaire and Maint of NADEP/Vermi Compost Pit 2 0 1 1 0.01 0.01
95%
59 Repair & Maint of Canal 2 0 0 0 0.00 0.00
0%
60 Construction of Village Haats 2 0 1 0 0.01 0.00
40%
Total 58,010 2,361 37,731 7,320 556.84 314.83
All 60 rows (zero-value rows hidden) ⇩ Export to Excel