MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 16,047 1,241 13,827 82 28.37 24.98
88%
2 Construction of Bund 3,869 29 1,877 1,153 24.08 14.57
61%
3 Farm Pond 2,843 128 757 136 17.04 7.69
45%
4 Land Development 2,217 7 1,543 90 23.09 9.45
41%
5 Constr of Cement Concrete Roads 2,049 74 1,164 164 26.71 16.74
63%
6 Construction of Well 1,697 12 1,350 123 26.83 20.56
77%
7 Construction of Road and Culvert 1,158 13 636 155 46.13 22.75
49%
8 Goat Shelter 1,119 0 402 14 3.53 1.55
44%
9 Plantation 932 141 431 167 21.67 7.46
34%
10 Construction of Check Dam/Stop Dam 870 26 510 211 31.26 15.94
51%
11 Construction of NADEP/Vermi Compost Pit 681 10 360 141 1.24 0.87
70%
12 Construction of Tank 633 28 243 236 20.25 12.59
62%
13 Cattle Shed 554 3 139 47 3.62 2.34
65%
14 Construction of Toilets 495 1 340 38 1.09 0.60
55%
15 Construction of Recharge Pits 372 3 216 60 0.92 0.27
29%
16 Construction of Trench 361 3 177 129 7.59 4.72
62%
17 Culvert 323 26 215 40 3.42 2.56
75%
18 Solid and Liquid Waste Management 283 13 81 99 0.80 0.43
54%
19 Well Recharge 251 9 76 28 0.84 0.60
72%
20 Boulder Check/Gully Plug 188 4 100 66 2.89 1.75
61%
21 Constr of GP Bhawan 179 20 80 44 2.49 1.30
52%
22 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 176 8 106 22 2.49 1.08
43%
23 Constr of Gabion 144 9 33 91 1.28 0.61
48%
24 Repair & maint of Pond/ Tank 125 7 46 42 8.35 5.44
65%
25 Construction of Crematorium 117 14 40 27 1.59 0.78
49%
26 Constr of Aganwadi 109 17 46 19 2.14 1.23
57%
27 Construction of Percolation Tank 104 4 20 19 1.53 0.99
65%
28 Constr of Compound wall 101 7 60 22 0.88 0.64
73%
29 Community Sanitary Complex 83 4 35 11 0.22 0.14
65%
30 Repair & Maint of Check Dam/Stop Dam 78 3 25 36 0.70 0.45
64%
31 Repair & maint of Road 73 2 20 40 0.82 0.51
63%
32 Repair & maint of Water Harvesting Structures 62 0 21 37 0.47 0.31
67%
33 Repair & Maint of Community infrastructure 50 1 17 25 1.02 0.45
44%
34 Renovation of traditional water bodies 47 0 21 0 0.77 0.35
45%
35 Terracing 42 1 6 22 0.50 0.09
17%
36 Construction of Play field 37 4 16 9 0.77 0.41
53%
37 Constr of Kitchen Shed 23 2 12 9 0.09 0.06
65%
38 Nursery Development 20 2 0 10 0.06 0.00
4%
39 Other Works 16 0 12 1 0.05 0.05
93%
40 Piggery Shelter 16 6 0 3 0.08 0.04
56%
41 Underground Dyke for Ground Water Recharge 14 1 10 1 0.38 0.25
65%
42 Construction of Other Community Building/Assets 13 1 4 4 0.32 0.11
36%
43 Constr of Food Grain storage 13 2 4 3 0.43 0.39
90%
44 Bio-Fertilizer 12 1 4 3 0.07 0.02
33%
45 Works for Flood Control and Protection 12 0 1 1 0.04 0.03
79%
46 Repair & Maint of Bund 10 0 4 5 0.28 0.12
43%
47 Repair & maint of Percolation Tank 10 0 2 8 0.01 0.01
82%
48 Roof Water Harvesting on gov/panchayat bldg 10 0 1 2 0.01 0.00
83%
49 Construction of Fish Drying Infrastructure 8 0 0 2 0.00 0.00
0%
50 Renovation of Canal 8 0 5 0 0.34 0.06
16%
51 Construction of Spur 7 0 3 3 0.20 0.16
83%
52 Construction of building/workshed for SHG 6 0 1 2 0.03 0.02
58%
53 Poultry Shelter 5 0 2 1 0.06 0.03
50%
54 Construction of Village Haats 4 1 2 0 0.04 0.04
88%
55 Construction of Embankment 4 0 2 1 0.22 0.17
80%
56 Grass Land Development 2 1 0 0 0.16 0.08
48%
57 Bio-gas plant 2 0 0 0 0.00 0.00
0%
58 Deepening / Desilting of Flood Channels 2 0 0 0 0.00 0.00
0%
59 Strengthening of Embankment 1 0 1 0 0.02 0.02
98%
60 Repaire and Maint of NADEP/Vermi Compost Pit 1 0 0 1 0.00 0.00
0%
Total 38,688 1,889 25,106 3,705 320.28 184.89
All 60 rows (zero-value rows hidden) ⇩ Export to Excel