MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 24,301 1,482 20,066 316 44.00 36.83
84%
2 Construction of Toilets 4,155 5 3,198 291 5.10 3.04
60%
3 Construction of Bund 2,983 27 1,210 999 7.25 3.46
48%
4 Plantation 1,934 197 723 430 27.22 6.01
22%
5 Constr of Cement Concrete Roads 1,856 148 1,096 286 22.00 14.88
68%
6 Cattle Shed 1,680 39 952 375 11.66 8.20
70%
7 Land Development 1,224 4 845 128 12.41 6.95
56%
8 Construction of NADEP/Vermi Compost Pit 1,027 30 362 395 2.37 1.01
43%
9 Construction of Road and Culvert 951 31 784 30 47.10 28.14
60%
10 Construction of Check Dam/Stop Dam 909 12 449 290 13.73 8.93
65%
11 Farm Pond 713 47 285 126 9.37 4.02
43%
12 Construction of Recharge Pits 664 10 124 370 0.73 0.18
25%
13 Solid and Liquid Waste Management 487 11 106 253 1.10 0.55
50%
14 Construction of Percolation Tank 460 6 341 27 1.36 0.75
55%
15 Construction of Well 395 27 155 77 5.26 2.16
41%
16 Goat Shelter 292 1 119 141 0.94 0.40
42%
17 Works for Flood Control and Protection 278 90 73 48 3.29 2.08
63%
18 Roof Water Harvesting on gov/panchayat bldg 258 4 75 103 0.13 0.04
29%
19 Culvert 197 39 97 25 1.96 1.20
61%
20 Well Recharge 181 2 47 34 0.50 0.22
43%
21 Renovation of traditional water bodies 160 0 87 0 0.27 1.48
552%
22 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 156 3 85 32 1.57 1.05
67%
23 Construction of Tank 153 10 33 59 1.94 0.50
26%
24 Boulder Check/Gully Plug 148 2 48 65 0.87 0.33
38%
25 Construction of Crematorium 113 17 41 7 1.77 0.58
33%
26 Construction of Trench 96 5 48 30 1.00 0.57
57%
27 Constr of Compound wall 80 23 32 10 2.46 1.62
66%
28 Constr of Gabion 75 2 50 13 2.01 1.06
53%
29 Constr of GP Bhawan 73 12 31 18 3.79 2.29
60%
30 Repair & Maint of Check Dam/Stop Dam 72 1 31 33 2.63 1.16
44%
31 Construction of Fish Drying Infrastructure 71 2 29 10 0.65 0.27
42%
32 Community Sanitary Complex 67 20 30 10 0.56 0.25
45%
33 Constr of Aganwadi 57 8 31 5 2.34 1.20
52%
34 Construction of Play field 53 8 39 4 1.49 0.65
44%
35 Repair & maint of Pond/ Tank 49 8 15 16 1.24 0.29
24%
36 Terracing 45 3 11 22 0.22 0.05
24%
37 Nursery Development 34 1 1 23 0.07 0.01
12%
38 Construction of Village Haats 34 7 22 2 0.14 0.08
60%
39 Repair & Maint of Bund 29 1 7 7 0.11 0.02
19%
40 Constr of Food Grain storage 23 5 9 6 0.64 0.36
56%
41 Other Works 20 1 6 1 0.05 0.00
6%
42 Repair & maint of Road 17 2 9 2 0.75 0.44
59%
43 Grass Land Development 17 6 1 8 1.09 0.16
14%
44 Bio-Fertilizer 15 3 2 2 0.10 0.03
27%
45 Repair & Maint of Community infrastructure 11 0 9 2 0.40 0.33
82%
46 Repaire and Maint of NADEP/Vermi Compost Pit 11 0 1 4 0.02 0.02
87%
47 Repair & maint of Water Harvesting Structures 11 0 0 7 0.07 0.00
0%
48 Poultry Shelter 8 0 3 4 0.02 0.00
15%
49 Underground Dyke for Ground Water Recharge 8 0 4 0 0.20 0.08
39%
50 Construction of building/workshed for SHG 4 0 2 0 0.22 0.18
82%
51 Construction of Spur 4 0 0 2 0.10 0.03
26%
52 Construction of Other Community Building/Assets 4 1 0 0 0.02 0.00
7%
53 Construction of Canal 4 0 0 0 0.00 0.00
0%
54 Repair & maint of Percolation Tank 3 0 1 2 0.00 0.00
81%
55 Strengthening of Embankment 2 0 2 0 0.05 0.03
64%
56 Construction of Embankment 2 1 0 0 0.09 0.01
7%
57 Deepening / Desilting of Flood Channels 1 0 0 1 0.00 0.00
0%
58 Lining of Canal 1 0 0 0 0.00 0.00
0%
59 Repair & maint of Gully Plugs 1 0 0 0 0.00 0.00
0%
Total 46,677 2,364 31,827 5,151 246.44 144.20
All 59 rows (zero-value rows hidden) ⇩ Export to Excel