MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 19,747 233 18,507 145 36.84 32.17
87%
2 Land Development 10,618 5 6,683 955 59.13 26.69
45%
3 Construction of Check Dam/Stop Dam 4,165 15 2,654 663 108.81 70.86
65%
4 Plantation 2,915 134 1,617 641 49.45 16.54
33%
5 Construction of Toilets 2,589 0 1,326 8 1.37 0.60
44%
6 Construction of NADEP/Vermi Compost Pit 2,534 2 1,257 1,228 2.50 1.38
55%
7 Solid and Liquid Waste Management 2,119 2 804 1,264 1.32 0.64
49%
8 Construction of Bund 1,594 9 898 490 21.65 13.31
62%
9 Farm Pond 1,462 30 509 123 25.31 13.60
54%
10 Cattle Shed 1,359 11 385 572 9.90 7.12
72%
11 Construction of Road and Culvert 1,258 4 853 90 58.18 36.05
62%
12 Constr of Cement Concrete Roads 1,237 9 674 214 25.78 14.26
55%
13 Construction of Trench 991 15 452 177 21.93 14.75
67%
14 Well Recharge 567 7 195 175 8.48 5.27
62%
15 Construction of Tank 553 5 137 224 11.64 7.83
67%
16 Construction of Well 525 12 300 71 10.12 5.36
53%
17 Construction of Recharge Pits 480 0 146 237 3.60 2.66
74%
18 Goat Shelter 407 5 145 99 2.09 0.80
38%
19 Repair & maint of Pond/ Tank 298 0 163 120 5.18 3.75
72%
20 Poultry Shelter 206 2 50 34 0.83 0.22
27%
21 Roof Water Harvesting on gov/panchayat bldg 198 0 61 77 1.42 0.86
60%
22 Construction of Percolation Tank 183 3 73 46 3.18 1.97
62%
23 Renovation of traditional water bodies 141 0 113 1 2.35 0.90
38%
24 Terracing 138 0 57 69 1.23 0.90
73%
25 Repair & maint of Water Harvesting Structures 136 1 49 84 1.42 1.15
81%
26 Other Works 107 0 30 73 0.55 0.30
55%
27 Boulder Check/Gully Plug 106 1 35 54 0.92 0.64
70%
28 Construction of Crematorium 99 0 93 4 1.82 1.60
88%
29 Repair & Maint of Check Dam/Stop Dam 91 1 44 36 2.14 1.42
66%
30 Construction of Play field 89 0 70 13 2.28 1.36
59%
31 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 87 0 51 26 5.02 4.73
94%
32 Constr of Aganwadi 84 1 42 34 1.60 0.76
47%
33 Repair & maint of Road 70 0 27 41 2.75 1.36
50%
34 Nursery Development 67 2 7 36 2.22 0.69
31%
35 Repair & Maint of Bund 64 0 29 30 0.67 0.39
59%
36 Community Sanitary Complex 57 0 33 18 0.22 0.16
74%
37 Repair & maint of Percolation Tank 54 0 19 34 0.69 0.52
75%
38 Underground Dyke for Ground Water Recharge 47 0 13 5 0.41 0.30
72%
39 Culvert 46 0 14 3 0.57 0.40
70%
40 Constr of Compound wall 43 0 17 23 0.37 0.26
70%
41 Repair & Maint of Community infrastructure 43 0 8 5 0.37 0.19
51%
42 Repaire and Maint of NADEP/Vermi Compost Pit 39 0 21 18 0.03 0.02
63%
43 Construction of Embankment 36 0 25 11 0.73 0.61
83%
44 Construction of Other Community Building/Assets 36 0 4 0 0.09 0.06
70%
45 Constr of Kitchen Shed 29 0 5 24 0.06 0.04
67%
46 Constr of Food Grain storage 26 0 10 13 0.64 0.17
27%
47 Constr of Gabion 25 1 9 14 0.35 0.18
50%
48 Construction of building/workshed for SHG 20 0 8 8 0.59 0.18
30%
49 Constr of GP Bhawan 19 0 12 4 0.87 0.41
47%
50 Construction of Spur 18 1 7 6 0.62 0.53
86%
51 Construction of Canal 16 0 0 6 0.02 0.00
0%
52 Grass Land Development 13 0 5 6 0.32 0.08
25%
53 Construction of Fish Drying Infrastructure 7 0 1 0 0.21 0.19
93%
54 Bio-gas plant 6 0 0 0 0.00 0.00
0%
55 Bio-Fertilizer 6 0 3 3 0.01 0.00
79%
56 Lining of Canal 4 0 0 4 0.03 0.00
0%
57 Deepening / Desilting of Flood Channels 4 0 0 0 0.01 0.00
0%
58 Piggery Shelter 2 0 0 2 0.04 0.00
0%
59 Works for Flood Control and Protection 2 0 1 1 0.03 0.03
88%
60 Repair & Maint of Canal 1 0 0 1 0.00 0.00
0%
61 Renovation of Canal 1 0 0 1 0.03 0.00
0%
62 Lift Irrigation 1 0 1 0 0.01 0.00
0%
Total 57,885 511 38,752 8,364 501.00 297.22
All 62 rows (zero-value rows hidden) ⇩ Export to Excel