MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 29,186 375 27,869 76 52.40 48.70
93%
2 Land Development 12,230 9 6,897 3,282 117.27 41.11
35%
3 Farm Pond 7,182 95 3,501 912 131.61 84.55
64%
4 Construction of Bund 4,212 3 1,447 852 40.05 23.75
59%
5 Construction of Check Dam/Stop Dam 3,546 19 1,767 717 146.27 106.08
73%
6 Construction of NADEP/Vermi Compost Pit 3,391 7 1,410 1,775 4.25 2.50
59%
7 Plantation 3,017 175 1,394 723 64.91 23.00
35%
8 Solid and Liquid Waste Management 2,716 8 749 1,640 5.31 2.69
51%
9 Construction of Toilets 2,403 1 1,663 95 1.55 0.95
61%
10 Constr of Cement Concrete Roads 1,998 23 1,211 207 46.45 23.42
50%
11 Construction of Well 1,821 27 823 210 23.91 13.80
58%
12 Construction of Road and Culvert 1,701 4 850 196 85.22 51.07
60%
13 Cattle Shed 1,684 42 611 482 17.33 8.69
50%
14 Construction of Tank 399 15 112 132 14.66 10.52
72%
15 Boulder Check/Gully Plug 387 1 80 20 3.44 1.95
57%
16 Repair & maint of Pond/ Tank 353 7 109 180 2.82 2.02
72%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 316 1 159 107 10.72 6.24
58%
18 Well Recharge 296 2 68 43 3.10 1.96
63%
19 Renovation of traditional water bodies 271 0 223 4 9.90 6.17
62%
20 Repaire and Maint of NADEP/Vermi Compost Pit 250 0 56 186 0.34 0.19
56%
21 Construction of Recharge Pits 241 0 91 48 2.07 1.22
59%
22 Construction of Percolation Tank 221 1 113 29 9.56 7.43
78%
23 Constr of Gabion 212 1 13 7 19.07 17.71
93%
24 Construction of Trench 202 3 101 27 8.04 6.40
80%
25 Construction of Crematorium 152 1 141 8 3.03 2.71
90%
26 Terracing 149 1 50 87 2.04 0.93
46%
27 Constr of Aganwadi 125 4 64 44 2.20 1.59
72%
28 Construction of Play field 122 0 106 5 3.39 2.23
66%
29 Construction of Fish Drying Infrastructure 111 0 36 24 1.78 1.22
68%
30 Goat Shelter 110 0 47 28 0.53 0.37
71%
31 Community Sanitary Complex 107 4 58 29 0.54 0.32
60%
32 Constr of GP Bhawan 89 1 23 53 1.52 0.81
54%
33 Roof Water Harvesting on gov/panchayat bldg 89 1 23 40 0.49 0.30
62%
34 Culvert 77 0 48 3 3.54 2.96
84%
35 Repair & Maint of Check Dam/Stop Dam 67 3 25 32 0.71 0.47
65%
36 Other Works 55 0 20 31 0.60 0.31
52%
37 Constr of Compound wall 47 2 32 7 0.67 0.55
82%
38 Repair & maint of Road 40 0 7 27 1.22 1.04
85%
39 Repair & Maint of Community infrastructure 39 0 5 10 0.44 0.37
85%
40 Repair & Maint of Bund 32 0 11 21 0.19 0.15
81%
41 Poultry Shelter 30 0 12 9 0.14 0.12
86%
42 Nursery Development 30 0 3 12 1.59 0.26
16%
43 Underground Dyke for Ground Water Recharge 29 1 9 0 0.94 0.65
69%
44 Constr of Food Grain storage 28 0 6 13 0.22 0.16
75%
45 Fish Culture 25 0 10 2 0.60 0.27
44%
46 Repair & maint of Water Harvesting Structures 24 2 10 10 0.77 0.63
82%
47 Construction of Embankment 21 0 6 14 0.28 0.23
82%
48 Repair & maint of Percolation Tank 19 0 12 7 0.47 0.32
68%
49 Bio-Fertilizer 19 0 10 8 0.10 0.08
84%
50 Grass Land Development 19 0 2 15 0.54 0.03
6%
51 Construction of Other Community Building/Assets 16 0 2 3 0.16 0.11
65%
52 Constr of Kitchen Shed 16 0 0 16 0.02 0.00
0%
53 Construction of building/workshed for SHG 14 0 1 3 0.09 0.08
88%
54 Piggery Shelter 13 1 1 6 0.10 0.03
25%
55 Bio-gas plant 13 0 0 1 0.00 0.00
0%
56 Construction of Canal 10 0 4 1 0.35 0.24
68%
57 Construction of Spur 9 0 3 5 0.18 0.08
45%
58 Deepening / Desilting of Flood Channels 6 0 2 2 4.75 0.01
0%
59 Lining of Canal 5 0 0 3 0.09 0.05
51%
60 Lift Irrigation 4 0 1 2 0.10 0.01
13%
61 Renovation of Canal 3 0 0 2 0.00 0.00
0%
62 Construction of Village Haats 2 1 0 0 0.02 0.01
32%
63 Strengthening of Embankment 2 0 2 0 0.01 0.00
3%
64 Works for Flood Control and Protection 1 0 0 1 0.00 0.00
0%
65 Repair & Maint of Fish Drying Infrastructure 1 0 1 0 0.15 0.07
46%
Total 80,005 841 52,110 12,534 854.79 511.90
All 65 rows (zero-value rows hidden) ⇩ Export to Excel