MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 12,741 1,885 10,499 7 25.07 21.58
86%
2 Construction of Well 5,144 367 2,778 504 87.12 70.04
80%
3 Constr of Cement Concrete Roads 2,316 9 1,166 228 15.56 12.18
78%
4 Land Development 2,047 2 1,675 53 13.33 8.01
60%
5 Plantation 1,677 198 673 338 23.28 7.40
32%
6 Farm Pond 1,405 20 733 297 27.32 17.02
62%
7 Construction of Road and Culvert 1,151 8 394 155 52.48 36.65
70%
8 Construction of Toilets 946 0 464 15 2.59 1.90
73%
9 Construction of Recharge Pits 810 1 223 471 1.18 0.60
51%
10 Well Recharge 743 0 327 117 4.14 2.60
63%
11 Cattle Shed 500 3 13 90 8.92 6.17
69%
12 Construction of Check Dam/Stop Dam 413 8 180 114 9.51 4.30
45%
13 Construction of Tank 248 2 124 84 4.11 1.89
46%
14 Construction of NADEP/Vermi Compost Pit 244 0 22 149 0.71 0.19
27%
15 Solid and Liquid Waste Management 226 0 24 157 0.46 0.19
42%
16 Repair & maint of Pond/ Tank 216 1 65 122 2.96 1.58
53%
17 Construction of Trench 208 3 109 48 3.80 2.15
57%
18 Construction of Bund 134 1 57 51 1.20 0.63
53%
19 Constr of Aganwadi 104 0 75 10 2.46 1.74
71%
20 Construction of Crematorium 102 2 75 11 3.22 2.60
81%
21 Constr of GP Bhawan 91 2 56 23 4.32 2.50
58%
22 Construction of Play field 83 0 60 12 2.60 1.85
71%
23 Community Sanitary Complex 60 1 35 17 0.43 0.14
33%
24 Constr of Compound wall 51 1 22 19 1.63 0.96
59%
25 Roof Water Harvesting on gov/panchayat bldg 50 0 6 38 0.02 0.02
76%
26 Culvert 43 0 17 7 0.64 0.47
73%
27 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 43 0 8 16 0.29 0.13
44%
28 Works for Flood Control and Protection 40 0 9 23 0.98 0.68
70%
29 Constr of Kitchen Shed 36 0 5 28 0.10 0.01
13%
30 Boulder Check/Gully Plug 35 0 22 8 0.08 0.05
68%
31 Construction of Percolation Tank 33 0 12 17 0.44 0.26
59%
32 Constr of Gabion 28 0 5 22 0.19 0.15
78%
33 Repair & maint of Road 27 1 4 11 0.77 0.48
62%
34 Terracing 27 0 6 18 0.27 0.16
62%
35 Repair & maint of Water Harvesting Structures 21 0 2 16 0.07 0.04
58%
36 Grass Land Development 21 1 5 7 1.35 0.25
18%
37 Repair & Maint of Community infrastructure 20 2 10 2 0.88 0.50
57%
38 Repair & Maint of Check Dam/Stop Dam 16 0 1 10 0.03 0.00
8%
39 Nursery Development 16 0 6 10 0.48 0.16
34%
40 Constr of Food Grain storage 14 0 6 4 1.27 0.77
61%
41 Renovation of traditional water bodies 14 0 7 2 0.15 0.05
35%
42 Construction of building/workshed for SHG 10 0 4 3 0.12 0.11
92%
43 Construction of Other Community Building/Assets 7 0 1 3 0.19 0.07
37%
44 Repair & Maint of Bund 5 0 2 3 0.11 0.05
49%
45 Construction of Canal 4 0 0 0 0.05 0.05
91%
46 Repaire and Maint of NADEP/Vermi Compost Pit 4 0 0 3 0.03 0.00
0%
47 Other Works 4 0 0 2 0.00 0.00
0%
48 Bio-Fertilizer 4 0 0 0 0.00 0.00
0%
49 Construction of Fish Drying Infrastructure 3 0 2 1 0.06 0.05
83%
50 Piggery Shelter 2 0 0 1 0.00 0.00
0%
51 Goat Shelter 2 0 1 1 0.04 0.02
49%
52 Bio-gas plant 1 0 0 0 0.00 0.00
0%
53 Lining of Canal 1 0 0 1 0.00 0.00
0%
54 Repair & maint of Percolation Tank 1 0 0 1 0.00 0.00
0%
55 Lift Irrigation 1 0 0 0 0.02 0.00
0%
56 Underground Dyke for Ground Water Recharge 1 0 0 1 0.00 0.00
0%
Total 32,194 2,518 19,990 3,351 307.03 209.41
All 56 rows (zero-value rows hidden) ⇩ Export to Excel