MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 24,258 724 21,988 219 43.38 37.21
86%
2 Construction of Check Dam/Stop Dam 5,591 9 3,719 449 174.63 132.85
76%
3 Plantation 4,013 233 1,991 510 102.27 38.58
38%
4 Construction of Well 2,704 172 1,485 376 42.65 29.84
70%
5 Construction of Percolation Tank 2,564 18 1,379 746 117.49 99.15
84%
6 Farm Pond 1,755 15 1,112 93 14.04 7.97
57%
7 Land Development 1,495 5 1,012 31 10.22 4.25
42%
8 Construction of Tank 1,060 114 168 173 35.40 21.25
60%
9 Well Recharge 873 8 444 168 8.95 6.43
72%
10 Construction of Bund 775 0 332 379 4.78 2.59
54%
11 Construction of Toilets 690 2 442 4 0.99 0.55
56%
12 Construction of Road and Culvert 658 13 452 36 60.48 39.53
65%
13 Constr of Cement Concrete Roads 558 0 457 4 12.00 6.49
54%
14 Solid and Liquid Waste Management 514 8 239 213 1.37 0.51
38%
15 Construction of Trench 325 3 148 75 9.41 5.78
61%
16 Construction of Recharge Pits 319 0 144 98 0.92 0.59
64%
17 Boulder Check/Gully Plug 311 0 196 112 4.03 2.16
54%
18 Construction of NADEP/Vermi Compost Pit 295 1 119 148 0.42 0.07
16%
19 Cattle Shed 197 3 65 77 0.93 0.64
69%
20 Repair & maint of Pond/ Tank 181 0 119 45 0.91 0.70
77%
21 Roof Water Harvesting on gov/panchayat bldg 162 4 46 99 1.68 1.24
74%
22 Repair & maint of Percolation Tank 111 2 50 50 4.56 4.04
89%
23 Constr of Gabion 107 0 34 61 0.76 0.30
39%
24 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 79 1 49 17 2.39 1.13
48%
25 Construction of Crematorium 71 0 64 1 1.63 1.44
88%
26 Repair & Maint of Check Dam/Stop Dam 59 0 14 31 1.73 1.13
65%
27 Repair & maint of Water Harvesting Structures 52 2 17 20 0.46 0.29
62%
28 Nursery Development 49 1 22 9 0.62 0.12
20%
29 Constr of Aganwadi 46 4 29 7 1.02 0.76
75%
30 Constr of GP Bhawan 35 13 11 11 2.61 2.02
77%
31 Constr of Compound wall 26 0 12 13 0.92 0.66
71%
32 Community Sanitary Complex 25 8 10 3 0.15 0.08
52%
33 Constr of Kitchen Shed 24 0 4 20 0.03 0.00
8%
34 Repair & maint of Road 20 0 7 12 1.15 0.83
73%
35 Terracing 18 1 5 11 0.18 0.14
78%
36 Goat Shelter 15 2 7 6 0.07 0.05
66%
37 Renovation of traditional water bodies 14 0 7 0 0.22 0.18
84%
38 Other Works 12 0 4 6 0.07 0.02
26%
39 Constr of Food Grain storage 12 0 4 2 0.45 0.35
78%
40 Underground Dyke for Ground Water Recharge 12 0 11 1 0.21 0.17
81%
41 Grass Land Development 11 0 4 6 0.23 0.10
42%
42 Repair & Maint of Community infrastructure 10 0 3 5 0.22 0.16
71%
43 Construction of Play field 9 0 7 0 0.21 0.13
66%
44 Repair & Maint of Bund 7 0 1 5 0.11 0.07
61%
45 Repaire and Maint of NADEP/Vermi Compost Pit 6 0 3 3 0.15 0.14
93%
46 Works for Flood Control and Protection 4 0 0 4 0.15 0.00
0%
47 Poultry Shelter 3 0 0 2 0.00 0.00
0%
48 Construction of Fish Drying Infrastructure 3 0 0 1 0.05 0.00
0%
49 Culvert 2 0 1 0 0.21 0.15
70%
50 Repair & Maint of Canal 2 0 0 1 0.00 0.00
0%
51 Lining of Canal 2 0 0 2 0.00 0.00
0%
52 Construction of Spur 2 0 1 1 0.03 0.01
45%
53 Construction of Canal 2 0 1 0 0.10 0.03
35%
54 Construction of Embankment 1 0 0 1 0.00 0.00
0%
55 Piggery Shelter 1 0 0 1 0.00 0.00
0%
56 Bio-Fertilizer 1 0 0 0 0.02 0.00
0%
57 Bio-gas plant 1 0 0 0 0.00 0.00
0%
58 Renovation of Canal 1 0 0 0 0.06 0.04
76%
Total 50,153 1,366 36,439 4,368 667.72 452.92
All 58 rows (zero-value rows hidden) ⇩ Export to Excel