MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 6,295 976 3,948 15 12.52 9.06
72%
2 Construction of Well 2,898 37 2,222 263 43.55 31.55
72%
3 Construction of Check Dam/Stop Dam 2,331 3 1,597 473 29.62 17.25
58%
4 Construction of Toilets 2,054 0 1,804 113 2.21 1.71
77%
5 Plantation 1,873 175 941 410 34.21 11.92
35%
6 Construction of Bund 1,668 0 612 785 8.31 5.27
63%
7 Well Recharge 1,460 5 338 164 5.31 2.91
55%
8 Construction of NADEP/Vermi Compost Pit 1,323 0 799 379 1.37 0.68
50%
9 Construction of Recharge Pits 1,119 9 314 531 1.93 0.71
37%
10 Land Development 1,056 1 706 99 6.73 2.86
43%
11 Construction of Road and Culvert 829 2 513 102 30.11 16.96
56%
12 Constr of Cement Concrete Roads 764 4 578 62 10.33 6.65
64%
13 Farm Pond 675 2 348 60 8.54 4.64
54%
14 Construction of Trench 564 3 240 200 8.56 4.78
56%
15 Cattle Shed 380 1 337 20 2.56 2.02
79%
16 Construction of Tank 300 3 106 143 7.00 4.34
62%
17 Repair & Maint of Check Dam/Stop Dam 151 1 81 54 2.94 2.20
75%
18 Renovation of traditional water bodies 146 0 57 36 1.18 0.47
40%
19 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 127 2 59 51 2.42 1.72
71%
20 Repair & maint of Water Harvesting Structures 116 1 77 30 0.60 0.38
63%
21 Repair & maint of Pond/ Tank 116 2 46 51 2.37 1.46
62%
22 Boulder Check/Gully Plug 111 0 81 22 0.58 0.47
82%
23 Repair & Maint of Bund 106 0 56 48 1.13 0.72
63%
24 Solid and Liquid Waste Management 72 0 16 52 0.07 0.05
76%
25 Terracing 67 1 28 32 0.96 0.55
58%
26 Roof Water Harvesting on gov/panchayat bldg 59 0 17 28 0.32 0.15
48%
27 Construction of Spur 53 1 31 15 1.49 0.80
54%
28 Constr of Gabion 50 0 9 38 0.18 0.15
82%
29 Constr of Compound wall 49 7 16 24 0.73 0.37
51%
30 Construction of Crematorium 48 0 43 3 1.14 0.98
86%
31 Construction of Percolation Tank 46 0 13 16 1.97 0.56
29%
32 Constr of Kitchen Shed 44 0 4 36 0.02 0.00
31%
33 Constr of Aganwadi 36 1 22 8 1.13 0.70
62%
34 Repair & maint of Road 35 0 17 13 0.78 0.70
91%
35 Community Sanitary Complex 32 5 21 2 0.31 0.11
34%
36 Underground Dyke for Ground Water Recharge 32 1 15 16 0.50 0.15
29%
37 Construction of Play field 27 0 24 1 0.73 0.37
51%
38 Goat Shelter 22 2 8 7 0.11 0.06
51%
39 Constr of GP Bhawan 15 4 3 2 0.53 0.32
59%
40 Repair & maint of Percolation Tank 15 0 1 10 0.27 0.05
20%
41 Grass Land Development 14 0 1 9 0.27 0.10
38%
42 Works for Flood Control and Protection 12 0 5 7 0.22 0.12
55%
43 Nursery Development 12 0 2 8 0.96 0.09
10%
44 Culvert 11 0 5 2 0.33 0.09
29%
45 Constr of Food Grain storage 10 0 4 5 0.19 0.14
76%
46 Repaire and Maint of NADEP/Vermi Compost Pit 9 0 4 3 0.00 0.00
64%
47 Construction of Embankment 8 1 5 1 0.20 0.05
25%
48 Other Works 8 0 3 2 0.07 0.05
72%
49 Repair & Maint of Community infrastructure 7 0 3 3 0.16 0.10
60%
50 Poultry Shelter 7 0 4 2 0.03 0.02
69%
51 Bio-Fertilizer 6 0 2 3 0.04 0.00
7%
52 Construction of Canal 5 0 2 0 0.00 0.00
76%
53 Construction of building/workshed for SHG 5 0 2 2 0.08 0.07
91%
54 Piggery Shelter 3 0 2 1 0.01 0.01
93%
55 Lining of Canal 2 0 0 1 0.00 0.00
0%
56 Repair & Maint of Canal 1 0 0 1 0.00 0.00
0%
57 Bio-gas plant 1 0 0 0 0.00 0.00
0%
58 Construction of Other Community Building/Assets 1 0 1 0 0.00 0.00
95%
Total 27,286 1,250 16,193 4,464 237.87 137.68
All 58 rows (zero-value rows hidden) ⇩ Export to Excel