MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Overall

Rollup last refreshed: 2026-10-14 07:05:44.899714 · figures are real, from combined_work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 32,566 1,336 25,874 120 63.21 46.91
74%
2 Construction of Well 8,365 217 5,241 1,093 186.11 141.91
76%
3 Farm Pond 3,069 104 1,716 306 60.91 31.65
52%
4 Land Development 2,629 13 1,602 274 26.42 11.58
44%
5 Constr of Cement Concrete Roads 2,561 10 1,807 312 44.84 31.91
71%
6 Cattle Shed 1,942 2 1,392 49 25.33 15.71
62%
7 Construction of Road and Culvert 1,921 14 1,055 248 109.18 57.23
52%
8 Construction of Check Dam/Stop Dam 1,754 1 1,079 101 39.66 24.81
63%
9 Plantation 1,295 202 539 184 27.03 7.23
27%
10 Construction of Percolation Tank 1,147 27 647 177 16.72 11.42
68%
11 Well Recharge 822 1 555 15 8.74 5.80
66%
12 Construction of Recharge Pits 618 1 359 114 1.06 0.61
58%
13 Construction of Toilets 549 1 340 64 2.07 1.15
56%
14 Construction of NADEP/Vermi Compost Pit 460 0 141 228 0.55 0.23
42%
15 Construction of Trench 446 7 308 23 10.36 7.01
68%
16 Solid and Liquid Waste Management 401 3 155 194 1.76 0.87
50%
17 Construction of Crematorium 337 5 231 45 5.19 4.19
81%
18 Repair & maint of Pond/ Tank 323 17 120 91 15.14 10.84
72%
19 Construction of Tank 300 20 85 60 18.92 14.23
75%
20 Construction of Bund 176 3 99 31 4.15 2.12
51%
21 Construction of Play field 135 2 72 23 3.04 1.61
53%
22 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 125 0 78 35 7.08 2.41
34%
23 Constr of Aganwadi 124 2 93 10 2.93 2.00
68%
24 Renovation of traditional water bodies 112 0 71 5 3.27 1.69
52%
25 Constr of GP Bhawan 107 4 57 19 4.28 2.35
55%
26 Constr of Compound wall 93 3 49 19 4.62 3.68
80%
27 Repair & maint of Road 76 2 20 44 1.95 1.23
63%
28 Roof Water Harvesting on gov/panchayat bldg 74 6 1 9 0.31 0.14
45%
29 Culvert 53 2 32 9 2.10 0.99
47%
30 Community Sanitary Complex 48 0 40 5 0.20 0.17
86%
31 Boulder Check/Gully Plug 41 0 12 20 0.72 0.54
76%
32 Terracing 39 0 4 31 0.18 0.07
39%
33 Works for Flood Control and Protection 27 0 19 6 0.64 0.49
78%
34 Constr of Kitchen Shed 21 0 1 17 0.02 0.00
7%
35 Grass Land Development 21 5 2 6 0.85 0.35
41%
36 Repair & maint of Water Harvesting Structures 19 0 9 10 0.84 0.45
53%
37 Construction of Embankment 18 1 10 6 1.02 0.87
85%
38 Constr of Food Grain storage 17 1 7 6 0.80 0.59
73%
39 Constr of Gabion 16 0 7 4 0.25 0.16
64%
40 Repair & Maint of Community infrastructure 15 0 11 1 1.00 0.62
62%
41 Poultry Shelter 12 0 10 1 0.12 0.06
51%
42 Construction of Other Community Building/Assets 9 0 5 0 0.13 0.09
74%
43 Underground Dyke for Ground Water Recharge 8 0 5 0 0.05 0.02
40%
44 Construction of building/workshed for SHG 5 0 2 3 0.08 0.08
99%
45 Construction of Canal 5 0 2 1 0.15 0.10
68%
46 Repair & maint of Percolation Tank 5 0 2 1 0.07 0.04
53%
47 Goat Shelter 4 0 2 0 0.03 0.01
51%
48 Nursery Development 4 1 1 1 0.46 0.25
54%
49 Repair & Maint of Check Dam/Stop Dam 4 1 2 0 0.34 0.06
17%
50 Repaire and Maint of NADEP/Vermi Compost Pit 3 0 0 3 0.00 0.00
0%
51 Bio-gas plant 2 0 0 0 0.00 0.00
0%
52 Piggery Shelter 1 0 1 0 0.03 0.01
22%
53 Strengthening of Embankment 1 0 1 0 0.03 0.02
54%
54 Lining of Canal 1 0 1 0 0.03 0.01
25%
55 Construction of Village Haats 1 0 0 0 0.02 0.02
94%
56 Bio-Fertilizer 1 0 0 0 0.00 0.00
0%
57 Construction of Fish Drying Infrastructure 1 0 0 0 0.00 0.00
0%
Total 62,929 2,014 43,974 4,024 704.98 448.58
All 57 rows (zero-value rows hidden) ⇩ Export to Excel