MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 22,257 1,615 18,370 70 42.15 34.63
82%
2 Construction of Well 6,303 128 3,501 1,321 105.28 84.25
80%
3 Constr of Cement Concrete Roads 2,759 45 1,997 362 31.42 20.02
64%
4 Construction of Road and Culvert 2,032 11 1,193 356 82.87 45.23
55%
5 Plantation 1,692 190 883 280 33.85 7.38
22%
6 Cattle Shed 1,524 3 1,013 14 20.90 11.31
54%
7 Construction of Check Dam/Stop Dam 1,513 5 1,166 191 22.71 16.86
74%
8 Farm Pond 1,371 31 831 136 23.62 14.32
61%
9 Land Development 1,352 4 806 170 12.56 8.28
66%
10 Solid and Liquid Waste Management 888 1 49 674 0.20 0.05
27%
11 Well Recharge 864 2 549 54 3.04 2.17
71%
12 Construction of Toilets 761 0 395 304 2.37 1.05
45%
13 Construction of NADEP/Vermi Compost Pit 520 1 142 289 0.39 0.17
43%
14 Construction of Recharge Pits 496 2 140 318 0.56 0.26
46%
15 Repair & maint of Pond/ Tank 289 11 108 96 9.37 5.26
56%
16 Construction of Trench 274 1 178 34 2.48 1.70
69%
17 Constr of Aganwadi 197 21 104 38 3.88 2.45
63%
18 Construction of Play field 197 4 60 102 3.55 1.95
55%
19 Construction of Percolation Tank 194 13 75 46 4.45 2.56
58%
20 Construction of Crematorium 157 2 87 44 3.16 2.04
65%
21 Renovation of traditional water bodies 147 0 40 74 1.27 0.68
54%
22 Constr of Compound wall 114 4 18 75 1.81 0.73
40%
23 Construction of Bund 95 1 18 28 1.55 0.70
45%
24 Community Sanitary Complex 77 0 59 8 0.33 0.26
78%
25 Construction of Tank 73 4 23 26 4.58 3.30
72%
26 Constr of GP Bhawan 51 0 23 13 2.05 1.59
78%
27 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 42 0 11 24 0.51 0.21
42%
28 Strengthening of Embankment 41 0 35 0 2.26 1.82
81%
29 Culvert 35 0 29 3 1.10 0.87
79%
30 Grass Land Development 30 2 6 14 1.38 0.39
28%
31 Terracing 28 0 3 14 0.14 0.04
32%
32 Poultry Shelter 25 0 0 0 0.00 0.00
0%
33 Works for Flood Control and Protection 24 0 12 6 0.91 0.56
61%
34 Constr of Kitchen Shed 24 0 0 21 0.01 0.00
0%
35 Constr of Gabion 20 0 13 6 0.29 0.29
102%
36 Constr of Food Grain storage 19 2 9 7 1.24 0.61
49%
37 Repair & Maint of Community infrastructure 19 1 16 0 1.60 1.12
70%
38 Deepening / Desilting of Flood Channels 18 0 13 2 0.49 0.39
80%
39 Repair & maint of Road 18 0 7 6 0.64 0.30
48%
40 Construction of building/workshed for SHG 16 0 6 9 0.46 0.32
69%
41 Boulder Check/Gully Plug 14 0 3 10 0.04 0.04
87%
42 Bio-Fertilizer 14 0 2 3 0.05 0.02
48%
43 Repair & maint of Percolation Tank 7 0 2 3 0.05 0.04
74%
44 Repair & Maint of Check Dam/Stop Dam 7 0 2 4 0.04 0.04
96%
45 Nursery Development 5 1 1 1 0.46 0.11
25%
46 Other Works 4 0 0 2 0.00 0.00
0%
47 Construction of Fish Drying Infrastructure 3 0 1 0 0.02 0.02
88%
48 Underground Dyke for Ground Water Recharge 3 0 0 3 0.00 0.00
0%
49 Lining of Canal 2 0 0 1 0.00 0.00
0%
50 Goat Shelter 2 0 0 1 0.00 0.00
0%
51 Repaire and Maint of NADEP/Vermi Compost Pit 2 0 0 2 0.00 0.00
0%
52 Roof Water Harvesting on gov/panchayat bldg 2 0 1 1 0.09 0.06
64%
53 Construction of Canal 2 0 1 1 0.01 0.00
43%
54 Repair & maint of Water Harvesting Structures 1 0 0 1 0.00 0.00
0%
55 Piggery Shelter 1 0 0 1 0.00 0.00
0%
56 Construction of Spur 1 0 1 0 0.00 0.00
4%
57 Repair & maint of Gully Plugs 1 0 0 1 0.00 0.00
0%
58 Lift Irrigation 1 0 0 1 0.00 0.00
0%
59 Construction of Other Community Building/Assets 1 0 0 1 0.00 0.00
0%
Total 46,629 2,105 32,002 5,272 432.20 276.47
All 59 rows (zero-value rows hidden) ⇩ Export to Excel