MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 9,350 613 7,563 99 21.78 14.34
66%
2 Construction of Check Dam/Stop Dam 3,388 12 2,137 149 42.39 31.88
75%
3 Land Development 2,920 2 1,911 75 12.92 8.45
65%
4 Plantation 2,871 275 1,891 229 55.64 14.79
27%
5 Constr of Cement Concrete Roads 2,609 83 1,794 259 22.30 16.63
75%
6 Construction of Well 1,537 52 1,226 105 29.96 22.68
76%
7 Construction of Toilets 1,433 2 1,157 44 2.72 2.12
78%
8 Construction of Bund 1,378 6 797 358 14.56 9.38
64%
9 Construction of Road and Culvert 1,290 12 1,019 53 48.99 35.60
73%
10 Farm Pond 952 21 391 73 17.47 10.62
61%
11 Construction of NADEP/Vermi Compost Pit 883 54 198 295 3.64 0.90
25%
12 Well Recharge 737 2 160 129 6.45 1.24
19%
13 Solid and Liquid Waste Management 632 31 255 215 2.94 1.76
60%
14 Cattle Shed 448 5 201 78 2.65 1.54
58%
15 Construction of Trench 430 9 270 72 12.53 8.86
71%
16 Construction of Recharge Pits 377 13 129 138 0.81 0.40
50%
17 Repair & maint of Pond/ Tank 289 0 165 56 4.17 2.69
65%
18 Construction of Tank 287 12 109 68 9.07 4.33
48%
19 Boulder Check/Gully Plug 258 0 152 55 2.14 1.63
76%
20 Roof Water Harvesting on gov/panchayat bldg 183 2 100 60 0.36 0.23
62%
21 Constr of Compound wall 152 12 110 12 1.39 0.99
71%
22 Construction of Crematorium 130 1 112 3 3.13 2.26
72%
23 Renovation of traditional water bodies 123 1 93 3 2.30 1.09
48%
24 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 109 1 53 34 1.00 0.55
55%
25 Constr of Aganwadi 96 2 66 8 1.43 1.13
79%
26 Construction of Percolation Tank 92 2 38 25 5.03 3.18
63%
27 Constr of Gabion 79 0 31 24 0.97 0.38
39%
28 Construction of Play field 78 1 66 2 1.46 0.99
68%
29 Terracing 74 0 34 8 0.82 0.60
73%
30 Goat Shelter 70 3 21 17 0.26 0.11
44%
31 Repair & maint of Road 67 3 33 19 0.30 0.18
61%
32 Community Sanitary Complex 64 3 39 13 0.24 0.17
69%
33 Works for Flood Control and Protection 62 2 21 3 0.83 0.48
58%
34 Culvert 59 0 40 1 1.26 0.79
63%
35 Repair & maint of Water Harvesting Structures 46 0 20 16 0.37 0.22
61%
36 Other Works 42 10 20 4 0.91 0.09
10%
37 Repair & Maint of Check Dam/Stop Dam 42 0 13 20 0.63 0.26
41%
38 Repair & Maint of Bund 32 0 14 11 0.21 0.14
68%
39 Constr of GP Bhawan 26 0 16 5 0.92 0.63
68%
40 Construction of Fish Drying Infrastructure 26 0 0 0 0.00 0.00
0%
41 Construction of Spur 18 0 9 5 0.45 0.32
71%
42 Constr of Food Grain storage 17 2 9 3 1.01 0.81
80%
43 Repaire and Maint of NADEP/Vermi Compost Pit 17 1 4 6 0.10 0.07
72%
44 Underground Dyke for Ground Water Recharge 16 0 8 6 0.22 0.20
92%
45 Repair & Maint of Community infrastructure 14 0 6 2 0.04 0.02
62%
46 Nursery Development 13 0 0 2 0.18 0.00
0%
47 Constr of Kitchen Shed 11 0 6 4 0.01 0.01
71%
48 Construction of Other Community Building/Assets 9 1 4 3 0.18 0.15
80%
49 Repair & maint of Percolation Tank 7 0 0 5 0.50 0.46
92%
50 Construction of building/workshed for SHG 5 0 2 2 0.14 0.02
13%
51 Poultry Shelter 5 0 3 0 0.05 0.01
29%
52 Strengthening of Embankment 5 0 5 0 0.11 0.10
91%
53 Construction of Embankment 4 1 2 1 0.70 0.11
16%
54 Grass Land Development 4 0 1 1 0.03 0.00
15%
55 Bio-Fertilizer 4 0 0 1 0.02 0.00
0%
56 Deepening / Desilting of Flood Channels 3 0 2 0 0.02 0.03
135%
57 Piggery Shelter 2 0 1 0 0.00 0.00
99%
58 Construction of Canal 1 0 0 1 0.00 0.00
0%
59 Renovation of Canal 1 0 0 0 0.00 0.00
0%
60 Repair & Maint of Canal 1 1 0 0 0.05 0.01
19%
Total 33,878 1,253 22,527 2,880 340.76 206.64
All 60 rows (zero-value rows hidden) ⇩ Export to Excel