MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Farm Pond 23,642 89 21,494 300 165.59 76.51
46%
2 Rural Housing 22,657 680 21,466 30 43.17 40.31
93%
3 Construction of Bund 5,797 29 3,631 1,485 49.82 36.32
73%
4 Land Development 4,675 16 3,294 767 50.42 26.40
52%
5 Plantation 3,150 262 1,976 422 65.23 22.56
35%
6 Construction of Check Dam/Stop Dam 1,948 14 1,516 259 40.03 26.70
67%
7 Constr of Cement Concrete Roads 1,717 6 1,350 207 16.33 9.64
59%
8 Cattle Shed 1,581 95 526 730 8.52 5.01
59%
9 Construction of Toilets 1,335 0 725 2 0.64 0.29
45%
10 Construction of NADEP/Vermi Compost Pit 1,207 28 381 680 4.55 3.24
71%
11 Construction of Well 1,182 26 859 100 19.61 11.94
61%
12 Works for Flood Control and Protection 965 12 553 284 20.19 14.48
72%
13 Construction of Road and Culvert 897 9 600 107 41.13 23.69
58%
14 Solid and Liquid Waste Management 771 8 358 198 1.36 0.81
60%
15 Construction of Recharge Pits 525 7 233 214 4.01 3.04
76%
16 Well Recharge 496 44 165 86 2.66 1.12
42%
17 Construction of Trench 433 11 278 61 14.76 9.87
67%
18 Repair & maint of Pond/ Tank 409 8 162 144 10.72 8.37
78%
19 Constr of Gabion 290 8 130 139 3.89 2.55
66%
20 Construction of Tank 230 15 74 95 6.65 4.95
74%
21 Terracing 217 4 108 90 3.05 2.18
72%
22 Other Works 202 6 80 106 1.12 0.65
58%
23 Deepening / Desilting of Flood Channels 202 0 167 2 5.38 4.67
87%
24 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 171 3 59 82 3.24 1.80
56%
25 Construction of Crematorium 150 3 124 8 2.67 1.90
71%
26 Renovation of traditional water bodies 141 0 117 5 6.49 5.80
89%
27 Construction of Percolation Tank 138 2 63 32 2.49 1.82
73%
28 Boulder Check/Gully Plug 97 1 41 39 1.16 0.72
62%
29 Constr of Kitchen Shed 96 1 10 34 0.06 0.02
25%
30 Community Sanitary Complex 92 7 54 15 0.39 0.23
59%
31 Construction of Play field 84 0 56 5 1.88 0.92
49%
32 Roof Water Harvesting on gov/panchayat bldg 75 1 22 33 0.36 0.23
65%
33 Repair & maint of Water Harvesting Structures 74 1 33 33 1.05 0.71
67%
34 Constr of Aganwadi 71 6 34 20 1.07 0.67
63%
35 Constr of GP Bhawan 56 1 31 20 3.79 2.83
75%
36 Constr of Compound wall 52 7 10 19 0.84 0.25
29%
37 Goat Shelter 49 2 13 25 0.15 0.09
62%
38 Renovation of Canal 49 0 42 6 0.90 0.75
83%
39 Nursery Development 43 1 24 13 0.96 0.30
31%
40 Repair & Maint of Check Dam/Stop Dam 41 2 6 18 1.10 0.39
36%
41 Lining of Canal 39 4 22 7 4.37 2.35
54%
42 Construction of Canal 35 0 22 7 0.97 0.68
70%
43 Poultry Shelter 32 1 6 23 0.06 0.05
73%
44 Repair & Maint of Community infrastructure 31 0 12 18 0.86 0.27
31%
45 Constr of Food Grain storage 30 1 13 5 1.61 1.00
62%
46 Underground Dyke for Ground Water Recharge 24 0 10 11 0.28 0.19
68%
47 Grass Land Development 24 1 15 4 0.29 0.14
49%
48 Construction of building/workshed for SHG 24 2 9 12 0.17 0.13
80%
49 Repair & maint of Road 21 1 4 13 0.08 0.07
92%
50 Repair & Maint of Bund 20 2 7 10 0.56 0.37
67%
51 Construction of Spur 16 0 3 10 0.07 0.07
95%
52 Strengthening of Embankment 16 0 15 0 0.63 0.55
87%
53 Culvert 15 0 7 4 0.14 0.11
78%
54 Repaire and Maint of NADEP/Vermi Compost Pit 15 1 4 10 0.04 0.02
40%
55 Repair & Maint of Canal 13 0 7 5 0.24 0.19
83%
56 Construction of Fish Drying Infrastructure 13 0 5 4 0.16 0.11
67%
57 Lift Irrigation 7 0 7 0 0.40 0.33
83%
58 Repair & maint of Percolation Tank 6 0 3 2 0.15 0.11
77%
59 Construction of Embankment 4 0 1 1 0.04 0.03
86%
60 Bio-gas plant 4 0 0 0 0.00 0.00
0%
61 Bio-Fertilizer 3 0 2 1 0.02 0.02
105%
62 Piggery Shelter 2 0 2 0 0.04 0.04
81%
63 Construction of Village Haats 1 0 0 1 0.00 0.00
0%
Total 76,402 1,428 61,041 7,063 618.59 361.57
All 63 rows (zero-value rows hidden) ⇩ Export to Excel