MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 7,889 1,216 5,795 8 15.91 11.52
72%
2 Construction of Toilets 3,021 4 2,306 205 1.91 1.42
74%
3 Constr of Cement Concrete Roads 2,824 49 2,280 198 25.91 16.75
65%
4 Plantation 1,821 223 863 292 30.71 10.77
35%
5 Farm Pond 1,760 1 1,282 96 6.21 3.33
54%
6 Solid and Liquid Waste Management 1,634 0 503 1,050 1.24 0.45
36%
7 Well Recharge 1,201 1 314 273 4.80 3.15
66%
8 Construction of Check Dam/Stop Dam 860 8 303 317 12.43 7.45
60%
9 Construction of Well 746 86 433 78 13.72 9.12
67%
10 Construction of Percolation Tank 559 10 183 240 7.88 4.34
55%
11 Repair & maint of Pond/ Tank 487 5 145 293 3.76 2.19
58%
12 Construction of Recharge Pits 471 3 92 309 1.15 0.55
48%
13 Construction of NADEP/Vermi Compost Pit 376 7 180 131 0.82 0.45
55%
14 Construction of Road and Culvert 335 16 224 32 29.26 12.73
44%
15 Construction of Bund 319 0 128 141 2.16 1.39
64%
16 Works for Flood Control and Protection 250 9 142 74 6.65 4.62
69%
17 Construction of Trench 238 1 79 110 2.17 1.40
65%
18 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 225 4 96 61 4.26 2.76
65%
19 Land Development 224 0 131 24 3.56 1.99
56%
20 Construction of Play field 172 1 73 2 3.91 1.37
35%
21 Construction of Crematorium 154 3 76 19 2.21 1.37
62%
22 Terracing 144 1 55 74 0.87 0.48
55%
23 Repair & maint of Percolation Tank 144 0 36 96 1.88 0.92
49%
24 Constr of Kitchen Shed 110 2 42 40 0.21 0.12
59%
25 Constr of Aganwadi 101 12 61 14 3.15 1.53
49%
26 Cattle Shed 96 1 45 8 3.22 2.65
82%
27 Community Sanitary Complex 89 3 68 13 0.42 0.29
69%
28 Renovation of traditional water bodies 75 0 32 5 1.07 0.60
56%
29 Roof Water Harvesting on gov/panchayat bldg 64 0 16 40 0.07 0.03
42%
30 Construction of Tank 62 3 8 30 1.57 0.73
47%
31 Construction of building/workshed for SHG 46 0 26 10 0.59 0.39
66%
32 Grass Land Development 44 1 5 23 2.74 0.90
33%
33 Repair & maint of Water Harvesting Structures 43 0 18 22 0.54 0.30
55%
34 Constr of Gabion 43 0 13 24 0.26 0.19
74%
35 Constr of Compound wall 41 3 28 5 1.80 1.28
71%
36 Repair & Maint of Check Dam/Stop Dam 27 0 7 16 0.20 0.14
72%
37 Constr of GP Bhawan 27 3 20 3 2.58 1.93
75%
38 Boulder Check/Gully Plug 25 0 5 15 0.08 0.04
53%
39 Underground Dyke for Ground Water Recharge 19 0 3 14 0.07 0.02
30%
40 Other Works 17 0 10 7 0.11 0.06
61%
41 Repair & Maint of Community infrastructure 14 1 7 3 1.30 1.14
88%
42 Culvert 12 0 7 4 0.09 0.04
44%
43 Repair & maint of Road 11 0 2 4 0.24 0.18
77%
44 Construction of Spur 11 0 6 4 0.11 0.07
61%
45 Nursery Development 10 0 1 7 0.53 0.35
67%
46 Repair & Maint of Bund 8 0 4 3 0.07 0.05
76%
47 Constr of Food Grain storage 8 0 7 0 0.56 0.53
94%
48 Poultry Shelter 5 0 4 1 0.06 0.01
15%
49 Construction of Embankment 4 0 1 3 0.03 0.03
95%
50 Piggery Shelter 4 0 0 1 0.48 0.00
0%
51 Lift Irrigation 3 0 0 0 0.00 0.00
0%
52 Construction of Village Haats 2 0 2 0 0.13 0.10
76%
53 Construction of Canal 2 0 0 1 0.00 0.00
0%
54 Goat Shelter 1 0 1 0 0.17 0.08
44%
55 Repair & Maint of Canal 1 0 0 0 0.00 0.00
0%
56 Lining of Canal 1 0 1 0 0.01 0.01
81%
57 Construction of Other Community Building/Assets 1 0 0 0 0.05 0.00
0%
58 Construction of Fish Drying Infrastructure 1 0 0 1 0.00 0.00
0%
59 Bio-Fertilizer 1 0 0 1 0.00 0.00
0%
Total 26,883 1,677 16,169 4,445 205.88 114.31
All 59 rows (zero-value rows hidden) ⇩ Export to Excel