MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 10,873 263 10,155 33 20.37 18.44
91%
2 Construction of Check Dam/Stop Dam 8,544 22 6,641 525 97.37 65.44
67%
3 Land Development 7,156 3 5,103 1,109 911.42 20.12
2%
4 Construction of Bund 4,964 1 3,793 751 64.92 31.90
49%
5 Plantation 2,671 194 1,626 464 76.61 26.23
34%
6 Construction of Road and Culvert 1,564 2 953 186 82.97 50.08
60%
7 Farm Pond 1,458 4 724 187 20.96 12.11
58%
8 Construction of NADEP/Vermi Compost Pit 1,101 19 519 461 1.77 1.10
62%
9 Construction of Well 1,035 87 651 202 21.02 12.81
61%
10 Construction of Trench 966 7 672 155 57.52 46.29
81%
11 Constr of Cement Concrete Roads 863 4 525 118 18.36 7.92
43%
12 Well Recharge 855 10 403 195 12.64 8.00
63%
13 Boulder Check/Gully Plug 852 0 583 233 26.90 18.90
70%
14 Cattle Shed 493 21 150 206 3.39 1.63
48%
15 Constr of Gabion 256 2 145 101 5.04 3.74
74%
16 Construction of Tank 235 11 70 82 16.86 13.99
83%
17 Construction of Toilets 204 0 163 8 1.32 0.31
23%
18 Repair & maint of Pond/ Tank 192 0 100 70 6.62 4.90
74%
19 Repair & maint of Water Harvesting Structures 163 4 81 67 5.60 4.43
79%
20 Poultry Shelter 160 5 47 64 2.00 0.14
7%
21 Construction of Recharge Pits 98 0 26 39 5.24 0.13
2%
22 Construction of Percolation Tank 92 0 47 20 1.85 1.38
75%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 90 1 53 25 1.90 0.69
37%
24 Repair & Maint of Bund 88 0 47 40 0.38 0.18
49%
25 Community Sanitary Complex 86 0 61 23 0.34 0.25
74%
26 Constr of Aganwadi 82 3 54 14 3.13 1.64
53%
27 Roof Water Harvesting on gov/panchayat bldg 75 10 3 15 0.32 0.16
50%
28 Solid and Liquid Waste Management 75 0 29 42 0.19 0.06
31%
29 Repair & Maint of Check Dam/Stop Dam 73 1 37 33 2.23 1.65
74%
30 Goat Shelter 53 0 16 24 0.14 0.09
60%
31 Constr of Compound wall 50 14 3 33 2.86 0.30
11%
32 Grass Land Development 49 0 11 7 1.51 1.16
77%
33 Terracing 44 0 22 21 2.07 1.83
88%
34 Culvert 42 0 21 18 3.45 2.74
80%
35 Nursery Development 39 0 12 3 46.30 0.62
1%
36 Bio-Fertilizer 35 0 5 29 0.12 0.07
55%
37 Constr of Kitchen Shed 35 0 21 14 0.07 0.03
50%
38 Construction of Play field 34 0 24 0 1.32 0.80
61%
39 Constr of GP Bhawan 31 1 13 12 1.65 1.22
74%
40 Fish Culture 29 0 18 0 0.66 0.38
58%
41 Constr of Food Grain storage 29 2 15 10 2.41 1.58
66%
42 Repair & maint of Road 29 0 8 18 0.90 0.74
82%
43 Other Works 24 0 1 17 0.08 0.02
27%
44 Construction of Fish Drying Infrastructure 24 0 19 2 0.46 0.34
72%
45 Underground Dyke for Ground Water Recharge 22 0 11 9 0.29 0.17
60%
46 Construction of Embankment 20 0 10 10 0.86 0.68
80%
47 Construction of building/workshed for SHG 17 0 4 10 0.57 0.49
86%
48 Construction of Crematorium 14 0 11 1 0.23 0.16
69%
49 Repair & maint of Percolation Tank 8 0 3 5 0.16 0.15
91%
50 Repair & Maint of Community infrastructure 6 1 3 1 0.37 0.25
69%
51 Construction of Other Community Building/Assets 6 0 1 4 0.06 0.05
87%
52 Construction of Spur 6 0 1 5 0.06 0.04
72%
53 Construction of Canal 6 0 0 3 0.00 0.00
0%
54 Repair & maint of Gully Plugs 5 0 3 2 0.19 0.12
67%
55 Renovation of traditional water bodies 2 0 0 0 0.06 0.00
0%
56 Renovation of Canal 2 0 2 0 0.05 0.05
94%
57 Piggery Shelter 2 0 0 2 0.00 0.00
0%
58 Works for Flood Control and Protection 2 0 1 0 0.12 0.00
2%
59 Water Converation - Others 1 0 1 0 0.02 0.01
71%
60 Deepening / Desilting of Flood Channels 1 0 0 0 1.00 0.00
0%
Total 46,031 692 33,721 5,728 1,537.27 368.71
All 60 rows (zero-value rows hidden) ⇩ Export to Excel