MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 23,433 422 22,030 95 43.28 40.34
93%
2 Land Development 18,593 6 16,389 893 126.01 46.39
37%
3 Farm Pond 6,793 55 4,178 1,145 147.94 89.86
61%
4 Construction of Check Dam/Stop Dam 4,543 15 2,195 1,474 101.38 70.81
70%
5 Cattle Shed 3,775 91 2,195 807 16.66 10.64
64%
6 Construction of Toilets 3,209 3 2,563 142 3.17 2.37
75%
7 Constr of Cement Concrete Roads 2,481 43 1,874 339 34.88 27.56
79%
8 Construction of NADEP/Vermi Compost Pit 2,342 7 616 1,547 40.37 3.17
8%
9 Plantation 2,005 175 1,055 434 41.03 16.04
39%
10 Construction of Bund 1,785 2 1,192 392 31.83 15.40
48%
11 Construction of Road and Culvert 1,218 24 934 146 93.19 67.67
73%
12 Construction of Well 1,183 145 476 263 18.01 12.01
67%
13 Construction of Recharge Pits 1,063 2 200 702 1.07 0.27
25%
14 Poultry Shelter 816 0 645 68 8.18 6.92
85%
15 Construction of Tank 784 5 250 447 15.38 10.80
70%
16 Well Recharge 651 4 208 265 3.15 1.71
54%
17 Construction of Trench 614 0 414 122 11.47 7.59
66%
18 Solid and Liquid Waste Management 413 1 63 322 1.09 0.59
54%
19 Constr of Gabion 236 2 45 149 8.92 9.72
109%
20 Constr of Aganwadi 227 6 94 92 8.03 6.74
84%
21 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 210 0 187 14 3.25 2.07
64%
22 Repair & maint of Pond/ Tank 200 7 115 62 5.95 3.82
64%
23 Boulder Check/Gully Plug 198 0 68 118 1.80 0.81
45%
24 Construction of Percolation Tank 191 1 121 37 2.84 1.87
66%
25 Community Sanitary Complex 191 27 99 52 1.99 0.48
24%
26 Construction of Play field 179 3 98 39 11.48 8.07
70%
27 Underground Dyke for Ground Water Recharge 171 0 161 5 2.39 1.26
53%
28 Constr of Compound wall 169 13 50 89 7.86 5.89
75%
29 Other Works 154 1 10 75 0.17 0.11
67%
30 Constr of GP Bhawan 139 5 80 20 8.41 5.77
69%
31 Construction of Crematorium 88 1 57 17 2.99 1.67
56%
32 Constr of Food Grain storage 83 5 55 13 3.05 2.43
80%
33 Renovation of traditional water bodies 74 0 66 6 4.00 1.99
50%
34 Repair & Maint of Check Dam/Stop Dam 70 0 24 40 0.91 0.77
84%
35 Repaire and Maint of NADEP/Vermi Compost Pit 67 0 8 53 0.04 0.01
38%
36 Terracing 62 1 36 20 1.13 0.80
71%
37 Roof Water Harvesting on gov/panchayat bldg 57 1 13 35 1.23 0.91
74%
38 Goat Shelter 51 0 14 16 0.14 0.05
38%
39 Repair & Maint of Community infrastructure 47 0 8 25 1.16 0.79
68%
40 Repair & maint of Road 42 0 19 17 2.34 1.94
83%
41 Repair & maint of Water Harvesting Structures 40 0 11 25 0.35 0.23
65%
42 Culvert 33 0 15 13 0.70 0.43
62%
43 Repair & Maint of Bund 26 0 2 23 0.17 0.11
65%
44 Grass Land Development 26 0 15 7 0.42 0.23
54%
45 Construction of building/workshed for SHG 24 4 3 2 0.36 0.21
59%
46 Nursery Development 20 1 5 3 0.52 0.08
15%
47 Construction of Other Community Building/Assets 19 0 12 6 0.98 0.95
97%
48 Construction of Spur 18 1 4 10 0.19 0.07
36%
49 Constr of Kitchen Shed 17 0 2 15 0.14 0.08
58%
50 Construction of Canal 13 0 1 5 0.27 0.03
11%
51 Bio-Fertilizer 10 0 3 2 0.15 0.12
84%
52 Construction of Fish Drying Infrastructure 9 0 3 3 0.15 0.09
60%
53 Repair & maint of Percolation Tank 9 0 4 4 0.18 0.13
69%
54 Bio-gas plant 7 1 0 0 0.12 0.00
1%
55 Piggery Shelter 7 0 3 1 0.07 0.04
57%
56 Works for Flood Control and Protection 3 0 0 2 0.00 0.00
0%
57 Lining of Canal 3 0 0 1 0.00 0.00
0%
58 Lift Irrigation 2 0 2 0 0.02 0.01
78%
59 Construction of Embankment 1 0 1 0 0.04 0.04
96%
60 Construction of Village Haats 1 0 0 0 0.00 0.00
0%
61 Water Converation - Others 1 0 1 0 0.01 0.00
21%
62 Renovation of Canal 1 0 0 1 0.00 0.00
0%
Total 78,897 1,080 58,992 10,720 822.99 490.96
All 62 rows (zero-value rows hidden) ⇩ Export to Excel