| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Constr of Cement Concrete Roads | 22 | 0 | 16 | 5 | 14.65 | 10.87 | 74% |
| 2 | Construction of NADEP/Vermi Compost Pit | 21 | 0 | 8 | 3 | 2.04 | 1.47 | 72% |
| 3 | Construction of Check Dam/Stop Dam | 17 | 3 | 4 | 4 | 87.21 | 68.66 | 79% |
| 4 | Cattle Shed | 15 | 0 | 8 | 0 | 8.20 | 3.95 | 48% |
| 5 | Plantation | 15 | 2 | 9 | 3 | 31.02 | 3.86 | 12% |
| 6 | Construction of Road and Culvert | 13 | 1 | 8 | 0 | 41.02 | 31.88 | 78% |
| 7 | Construction of Recharge Pits | 11 | 0 | 5 | 6 | 1.13 | 0.81 | 72% |
| 8 | Construction of Bund | 10 | 0 | 1 | 0 | 83.72 | 0.16 | 0% |
| 9 | Works for Flood Control and Protection | 7 | 2 | 2 | 0 | 39.32 | 31.54 | 80% |
| 10 | Rural Housing | 5 | 0 | 4 | 0 | 0.90 | 0.63 | 69% |
| 11 | Repair & maint of Pond/ Tank | 5 | 0 | 1 | 4 | 4.54 | 3.14 | 69% |
| 12 | Well Recharge | 5 | 1 | 1 | 1 | 0.89 | 0.31 | 35% |
| 13 | Solid and Liquid Waste Management | 3 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 14 | Constr of GP Bhawan | 2 | 1 | 1 | 0 | 4.14 | 3.84 | 93% |
| 15 | Farm Pond | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 16 | Land Development | 2 | 0 | 1 | 0 | 4.49 | 2.30 | 51% |
| 17 | Constr of Gabion | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 18 | Renovation of traditional water bodies | 1 | 0 | 1 | 0 | 0.00 | 0.01 | 0% |
| 19 | Construction of Percolation Tank | 1 | 0 | 1 | 0 | 0.18 | 0.14 | 78% |
| 20 | Community Sanitary Complex | 1 | 0 | 1 | 0 | 0.43 | 0.43 | 100% |
| 21 | Construction of Crematorium | 1 | 0 | 1 | 0 | 5.77 | 3.91 | 68% |
| 22 | Construction of Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 23 | Construction of Toilets | 1 | 0 | 0 | 1 | 0.12 | 0.00 | 0% |
| 24 | Construction of Trench | 1 | 0 | 1 | 0 | 0.18 | 0.16 | 84% |
| 25 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 1 | 0 | 0 | 14.53 | 13.59 | 94% |
| 26 | Culvert | 1 | 0 | 1 | 0 | 0.35 | 0.04 | 11% |
| Total | 165 | 11 | 75 | 29 | 344.83 | 181.69 |