| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction of Toilets | 87 | 0 | 85 | 0 | 0.03 | 0.03 | 122% |
| 2 | Works for Flood Control and Protection | 47 | 0 | 32 | 13 | 4.36 | 3.77 | 87% |
| 3 | Rural Housing | 35 | 0 | 29 | 4 | 0.06 | 0.04 | 70% |
| 4 | Construction of Road and Culvert | 30 | 0 | 17 | 4 | 3.21 | 2.20 | 68% |
| 5 | Cattle Shed | 24 | 0 | 23 | 0 | 0.18 | 0.16 | 88% |
| 6 | Plantation | 24 | 12 | 6 | 3 | 0.46 | 0.06 | 13% |
| 7 | Farm Pond | 17 | 0 | 15 | 0 | 0.76 | 0.36 | 47% |
| 8 | Construction of Bund | 15 | 11 | 0 | 0 | 2.19 | 1.05 | 48% |
| 9 | Constr of Cement Concrete Roads | 14 | 0 | 6 | 4 | 0.08 | 0.04 | 49% |
| 10 | Construction of Embankment | 9 | 0 | 9 | 0 | 1.20 | 1.15 | 96% |
| 11 | Construction of Check Dam/Stop Dam | 6 | 0 | 4 | 2 | 0.14 | 0.13 | 88% |
| 12 | Construction of NADEP/Vermi Compost Pit | 6 | 0 | 4 | 2 | 0.09 | 0.05 | 55% |
| 13 | Constr of Aganwadi | 5 | 0 | 2 | 3 | 0.13 | 0.05 | 36% |
| 14 | Well Recharge | 5 | 1 | 4 | 0 | 0.01 | 0.01 | 41% |
| 15 | Land Development | 3 | 0 | 3 | 0 | 0.03 | 0.03 | 90% |
| 16 | Construction of Crematorium | 2 | 0 | 1 | 0 | 0.04 | 0.02 | 55% |
| 17 | Repair & maint of Pond/ Tank | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 97% |
| 18 | Construction of Percolation Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 19 | Strengthening of Embankment | 1 | 0 | 1 | 0 | 0.14 | 0.11 | 77% |
| 20 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 21 | Construction of Tank | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 93% |
| Total | 334 | 24 | 243 | 37 | 13.14 | 9.25 |