| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 53 | 0 | 44 | 0 | 0.09 | 0.07 | 75% |
| 2 | Constr of Cement Concrete Roads | 24 | 0 | 12 | 5 | 0.11 | 0.07 | 68% |
| 3 | Construction of Check Dam/Stop Dam | 16 | 1 | 13 | 0 | 0.58 | 0.43 | 74% |
| 4 | Solid and Liquid Waste Management | 12 | 0 | 5 | 7 | 0.01 | 0.01 | 47% |
| 5 | Construction of Road and Culvert | 12 | 0 | 7 | 1 | 1.07 | 0.81 | 75% |
| 6 | Plantation | 11 | 2 | 5 | 3 | 0.13 | 0.03 | 21% |
| 7 | Construction of Tank | 10 | 4 | 2 | 2 | 1.17 | 0.62 | 53% |
| 8 | Works for Flood Control and Protection | 9 | 3 | 3 | 2 | 0.93 | 0.71 | 76% |
| 9 | Construction of Recharge Pits | 7 | 0 | 3 | 4 | 0.02 | 0.00 | 20% |
| 10 | Construction of Well | 6 | 3 | 0 | 0 | 0.01 | 0.00 | 63% |
| 11 | Construction of Percolation Tank | 6 | 0 | 1 | 1 | 0.01 | 0.00 | 8% |
| 12 | Farm Pond | 6 | 5 | 0 | 0 | 0.21 | 0.17 | 77% |
| 13 | Construction of NADEP/Vermi Compost Pit | 5 | 0 | 3 | 2 | 0.03 | 0.02 | 66% |
| 14 | Land Development | 5 | 0 | 3 | 1 | 0.00 | 0.00 | 0% |
| 15 | Construction of Bund | 3 | 0 | 2 | 1 | 0.44 | 0.23 | 53% |
| 16 | Construction of Crematorium | 3 | 0 | 2 | 0 | 0.10 | 0.05 | 51% |
| 17 | Cattle Shed | 3 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 18 | Roof Water Harvesting on gov/panchayat bldg | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 19 | Renovation of traditional water bodies | 2 | 0 | 1 | 0 | 0.01 | 0.00 | 4% |
| 20 | Constr of Compound wall | 2 | 0 | 2 | 0 | 0.00 | 0.00 | 44% |
| 21 | Strengthening of Embankment | 2 | 0 | 0 | 0 | 0.26 | 0.00 | 0% |
| 22 | Constr of Aganwadi | 1 | 1 | 0 | 0 | 0.02 | 0.02 | 89% |
| 23 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 1 | 0 | 0.10 | 0.08 | 79% |
| 24 | Constr of GP Bhawan | 1 | 0 | 0 | 1 | 0.06 | 0.00 | 0% |
| 25 | Well Recharge | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| Total | 203 | 19 | 109 | 32 | 5.35 | 3.31 |