| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Cattle Shed | 53 | 0 | 36 | 0 | 32.59 | 21.15 | 65% |
| 2 | Construction of Bund | 35 | 0 | 28 | 5 | 43.99 | 16.42 | 37% |
| 3 | Constr of Cement Concrete Roads | 31 | 0 | 19 | 5 | 22.67 | 19.44 | 86% |
| 4 | Construction of NADEP/Vermi Compost Pit | 26 | 0 | 25 | 1 | 3.00 | 2.75 | 92% |
| 5 | Farm Pond | 17 | 0 | 10 | 6 | 17.38 | 8.91 | 51% |
| 6 | Rural Housing | 17 | 6 | 2 | 0 | 3.60 | 1.21 | 34% |
| 7 | Construction of Road and Culvert | 14 | 0 | 12 | 1 | 98.05 | 74.12 | 76% |
| 8 | Construction of Tank | 10 | 0 | 0 | 10 | 0.46 | 0.00 | 0% |
| 9 | Construction of Check Dam/Stop Dam | 9 | 0 | 3 | 6 | 13.58 | 5.97 | 44% |
| 10 | Plantation | 8 | 1 | 3 | 3 | 33.39 | 7.46 | 22% |
| 11 | Land Development | 6 | 0 | 4 | 2 | 22.07 | 1.76 | 8% |
| 12 | Works for Flood Control and Protection | 4 | 0 | 0 | 1 | 30.10 | 6.58 | 22% |
| 13 | Construction of Crematorium | 3 | 0 | 0 | 0 | 9.40 | 2.45 | 26% |
| 14 | Construction of Trench | 3 | 0 | 1 | 1 | 8.69 | 1.18 | 14% |
| 15 | Construction of Percolation Tank | 3 | 0 | 1 | 1 | 11.73 | 4.95 | 42% |
| 16 | Goat Shelter | 3 | 0 | 0 | 0 | 1.50 | 0.00 | 0% |
| 17 | Repair & maint of Pond/ Tank | 3 | 0 | 0 | 2 | 2.97 | 0.00 | 0% |
| 18 | Constr of Aganwadi | 2 | 1 | 0 | 1 | 5.30 | 0.02 | 0% |
| 19 | Construction of Play field | 1 | 0 | 1 | 0 | 1.86 | 0.82 | 44% |
| 20 | Renovation of traditional water bodies | 1 | 0 | 1 | 0 | 1.00 | 0.36 | 36% |
| 21 | Terracing | 1 | 0 | 0 | 1 | 7.41 | 0.00 | 0% |
| Total | 250 | 8 | 146 | 46 | 370.73 | 175.56 |