| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Cattle Shed | 84 | 0 | 11 | 26 | 34.20 | 8.91 | 26% |
| 2 | Construction of Bund | 60 | 0 | 5 | 1 | 95.77 | 48.79 | 51% |
| 3 | Constr of Cement Concrete Roads | 24 | 0 | 16 | 0 | 21.81 | 19.19 | 88% |
| 4 | Rural Housing | 22 | 0 | 22 | 0 | 3.49 | 3.22 | 92% |
| 5 | Farm Pond | 20 | 0 | 15 | 2 | 36.38 | 26.18 | 72% |
| 6 | Construction of NADEP/Vermi Compost Pit | 14 | 1 | 6 | 1 | 0.90 | 0.15 | 16% |
| 7 | Plantation | 10 | 1 | 4 | 1 | 13.77 | 7.79 | 57% |
| 8 | Land Development | 9 | 0 | 9 | 0 | 0.45 | 0.35 | 79% |
| 9 | Construction of Trench | 9 | 0 | 5 | 0 | 52.55 | 34.12 | 65% |
| 10 | Works for Flood Control and Protection | 8 | 0 | 3 | 0 | 12.25 | 9.57 | 78% |
| 11 | Construction of Percolation Tank | 7 | 0 | 3 | 2 | 30.48 | 23.82 | 78% |
| 12 | Construction of Road and Culvert | 6 | 0 | 6 | 0 | 58.77 | 26.59 | 45% |
| 13 | Repair & maint of Pond/ Tank | 4 | 0 | 2 | 1 | 0.96 | 0.85 | 88% |
| 14 | Construction of Crematorium | 4 | 1 | 0 | 2 | 10.52 | 3.90 | 37% |
| 15 | Construction of Check Dam/Stop Dam | 3 | 0 | 1 | 0 | 13.11 | 9.91 | 76% |
| 16 | Construction of Play field | 2 | 1 | 0 | 0 | 9.79 | 9.34 | 95% |
| 17 | Constr of GP Bhawan | 1 | 1 | 0 | 0 | 2.52 | 2.40 | 95% |
| 18 | Other Works | 1 | 0 | 1 | 0 | 1.98 | 1.67 | 84% |
| 19 | Construction of Tank | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| Total | 289 | 5 | 109 | 36 | 399.73 | 236.75 |