| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Land Development | 153 | 1 | 93 | 0 | 51.10 | 32.87 | 64% |
| 2 | Construction of Bund | 144 | 1 | 75 | 2 | 72.00 | 33.19 | 46% |
| 3 | Rural Housing | 60 | 14 | 32 | 0 | 10.38 | 7.51 | 72% |
| 4 | Cattle Shed | 42 | 0 | 14 | 3 | 23.73 | 11.49 | 48% |
| 5 | Constr of Cement Concrete Roads | 40 | 0 | 32 | 3 | 34.74 | 19.83 | 57% |
| 6 | Other Works | 11 | 0 | 0 | 0 | 1.32 | 0.00 | 0% |
| 7 | Construction of Road and Culvert | 8 | 0 | 3 | 1 | 6.10 | 1.17 | 19% |
| 8 | Plantation | 8 | 0 | 4 | 2 | 20.10 | 1.02 | 5% |
| 9 | Construction of NADEP/Vermi Compost Pit | 6 | 0 | 3 | 0 | 0.72 | 0.20 | 28% |
| 10 | Construction of Check Dam/Stop Dam | 5 | 0 | 1 | 3 | 27.87 | 7.60 | 27% |
| 11 | Repair & maint of Road | 5 | 0 | 3 | 0 | 2.78 | 2.84 | 102% |
| 12 | Works for Flood Control and Protection | 4 | 0 | 2 | 2 | 2.93 | 1.26 | 43% |
| 13 | Farm Pond | 3 | 2 | 0 | 0 | 4.43 | 2.92 | 66% |
| 14 | Constr of GP Bhawan | 2 | 0 | 0 | 1 | 3.60 | 0.00 | 0% |
| 15 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 2 | 0 | 0 | 2 | 0.06 | 0.00 | 0% |
| 16 | Construction of Fish Drying Infrastructure | 2 | 0 | 0 | 2 | 0.11 | 0.00 | 0% |
| 17 | Terracing | 2 | 0 | 1 | 0 | 0.97 | 0.87 | 90% |
| 18 | Repair & maint of Pond/ Tank | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 19 | Well Recharge | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 20 | Construction of Toilets | 1 | 0 | 1 | 0 | 0.43 | 0.42 | 97% |
| 21 | Community Sanitary Complex | 1 | 0 | 0 | 1 | 0.44 | 0.00 | 0% |
| 22 | Construction of Trench | 1 | 0 | 1 | 0 | 0.52 | 0.52 | 101% |
| 23 | Construction of Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 24 | Construction of Crematorium | 1 | 0 | 1 | 0 | 1.80 | 1.80 | 100% |
| 25 | Roof Water Harvesting on gov/panchayat bldg | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 26 | Constr of Aganwadi | 1 | 0 | 1 | 0 | 1.80 | 1.78 | 99% |
| Total | 507 | 18 | 267 | 27 | 267.93 | 127.31 |