| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction of NADEP/Vermi Compost Pit | 62 | 0 | 54 | 7 | 0.07 | 0.06 | 96% |
| 2 | Constr of Cement Concrete Roads | 49 | 3 | 36 | 3 | 0.61 | 0.46 | 76% |
| 3 | Rural Housing | 33 | 0 | 27 | 0 | 0.06 | 0.03 | 58% |
| 4 | Construction of Bund | 32 | 3 | 16 | 2 | 0.17 | 0.08 | 49% |
| 5 | Construction of Road and Culvert | 19 | 0 | 12 | 0 | 1.60 | 1.19 | 74% |
| 6 | Solid and Liquid Waste Management | 14 | 0 | 12 | 0 | 0.01 | 0.01 | 80% |
| 7 | Works for Flood Control and Protection | 13 | 1 | 5 | 4 | 0.40 | 0.21 | 53% |
| 8 | Land Development | 12 | 2 | 8 | 0 | 0.22 | 0.11 | 50% |
| 9 | Construction of Toilets | 7 | 1 | 5 | 0 | 0.03 | 0.01 | 23% |
| 10 | Construction of Check Dam/Stop Dam | 7 | 0 | 5 | 1 | 0.64 | 0.60 | 94% |
| 11 | Cattle Shed | 7 | 1 | 5 | 0 | 0.33 | 0.04 | 13% |
| 12 | Farm Pond | 6 | 0 | 0 | 6 | 0.07 | 0.00 | 0% |
| 13 | Construction of Embankment | 5 | 0 | 4 | 0 | 0.56 | 0.28 | 50% |
| 14 | Plantation | 4 | 0 | 4 | 0 | 0.13 | 0.01 | 8% |
| 15 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 3 | 1 | 0 | 0 | 0.18 | 0.01 | 8% |
| 16 | Construction of Percolation Tank | 3 | 0 | 2 | 0 | 0.19 | 0.17 | 91% |
| 17 | Repair & maint of Pond/ Tank | 2 | 0 | 0 | 2 | 0.01 | 0.00 | 0% |
| 18 | Construction of Play field | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 19 | Construction of Trench | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 20 | Renovation of traditional water bodies | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 57% |
| 21 | Constr of Compound wall | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 22 | Constr of Aganwadi | 1 | 0 | 1 | 0 | 0.03 | 0.04 | 107% |
| Total | 283 | 12 | 197 | 26 | 5.32 | 3.33 |