| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 40 | 7 | 27 | 0 | 7.34 | 6.84 | 93% |
| 2 | Constr of Cement Concrete Roads | 39 | 1 | 26 | 7 | 25.10 | 14.80 | 59% |
| 3 | Construction of Bund | 21 | 5 | 1 | 12 | 25.51 | 13.93 | 55% |
| 4 | Land Development | 13 | 0 | 0 | 13 | 0.00 | 0.00 | 0% |
| 5 | Construction of Crematorium | 12 | 0 | 0 | 9 | 14.31 | 0.00 | 0% |
| 6 | Piggery Shelter | 8 | 0 | 0 | 8 | 0.00 | 0.00 | 0% |
| 7 | Construction of NADEP/Vermi Compost Pit | 7 | 1 | 1 | 5 | 0.14 | 0.02 | 17% |
| 8 | Construction of Road and Culvert | 5 | 0 | 1 | 0 | 18.44 | 17.03 | 92% |
| 9 | Plantation | 4 | 0 | 2 | 0 | 15.06 | 0.43 | 3% |
| 10 | Farm Pond | 4 | 0 | 0 | 2 | 1.61 | 0.00 | 0% |
| 11 | Works for Flood Control and Protection | 4 | 0 | 1 | 1 | 11.84 | 1.83 | 15% |
| 12 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 3 | 0 | 0 | 0 | 0.50 | 0.00 | 0% |
| 13 | Solid and Liquid Waste Management | 3 | 0 | 0 | 3 | 0.20 | 0.00 | 0% |
| 14 | Constr of Aganwadi | 2 | 0 | 2 | 0 | 6.60 | 6.53 | 99% |
| 15 | Construction of Trench | 2 | 0 | 0 | 1 | 0.81 | 0.00 | 0% |
| 16 | Repair & maint of Pond/ Tank | 2 | 0 | 0 | 2 | 0.48 | 0.00 | 0% |
| 17 | Construction of Percolation Tank | 2 | 1 | 0 | 0 | 15.64 | 0.01 | 0% |
| 18 | Construction of Check Dam/Stop Dam | 2 | 1 | 0 | 1 | 11.30 | 0.01 | 0% |
| 19 | Renovation of traditional water bodies | 2 | 0 | 2 | 0 | 1.14 | 0.90 | 79% |
| 20 | Construction of Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 21 | Construction of Play field | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 22 | Construction of Well | 1 | 0 | 1 | 0 | 0.00 | 0.74 | 0% |
| Total | 178 | 16 | 64 | 66 | 156.02 | 63.08 |