| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 205 | 4 | 190 | 0 | 0.45 | 0.42 | 95% |
| 2 | Construction of Toilets | 69 | 0 | 62 | 0 | 0.04 | 0.03 | 83% |
| 3 | Farm Pond | 39 | 0 | 26 | 3 | 0.81 | 0.56 | 70% |
| 4 | Construction of Well | 23 | 0 | 13 | 0 | 0.54 | 0.40 | 75% |
| 5 | Constr of Cement Concrete Roads | 18 | 0 | 16 | 2 | 1.54 | 0.15 | 10% |
| 6 | Construction of Check Dam/Stop Dam | 14 | 0 | 11 | 3 | 0.62 | 0.57 | 91% |
| 7 | Well Recharge | 13 | 0 | 3 | 2 | 0.13 | 0.09 | 69% |
| 8 | Construction of Percolation Tank | 12 | 0 | 4 | 5 | 0.23 | 0.17 | 72% |
| 9 | Construction of Road and Culvert | 12 | 0 | 4 | 6 | 0.20 | 0.17 | 85% |
| 10 | Solid and Liquid Waste Management | 11 | 0 | 7 | 4 | 0.77 | 0.58 | 75% |
| 11 | Land Development | 9 | 0 | 9 | 0 | 0.09 | 0.06 | 69% |
| 12 | Plantation | 8 | 0 | 3 | 3 | 0.16 | 0.05 | 30% |
| 13 | Constr of GP Bhawan | 5 | 0 | 2 | 2 | 0.27 | 0.23 | 85% |
| 14 | Constr of Aganwadi | 4 | 0 | 2 | 1 | 0.01 | 0.00 | 32% |
| 15 | Culvert | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 16 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 101% |
| 17 | Construction of Tank | 1 | 0 | 1 | 0 | 0.06 | 0.05 | 85% |
| 18 | Construction of Embankment | 1 | 0 | 1 | 0 | 0.09 | 0.08 | 99% |
| 19 | Repair & maint of Pond/ Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 20 | Repair & maint of Road | 1 | 0 | 0 | 0 | 0.14 | 0.00 | 0% |
| 21 | Repair & maint of Water Harvesting Structures | 1 | 0 | 1 | 0 | 0.13 | 0.12 | 95% |
| 22 | Construction of Crematorium | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 23 | Constr of Food Grain storage | 1 | 0 | 1 | 0 | 0.08 | 0.08 | 95% |
| 24 | Constr of Compound wall | 1 | 0 | 1 | 0 | 0.10 | 0.09 | 95% |
| Total | 453 | 4 | 358 | 34 | 6.46 | 3.92 |