| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 258 | 32 | 211 | 0 | 0.52 | 0.47 | 90% |
| 2 | Construction of Well | 44 | 8 | 22 | 4 | 0.69 | 0.61 | 89% |
| 3 | Plantation | 38 | 9 | 23 | 2 | 1.09 | 0.32 | 29% |
| 4 | Constr of Cement Concrete Roads | 13 | 0 | 9 | 1 | 0.18 | 0.08 | 44% |
| 5 | Construction of Bund | 13 | 0 | 4 | 9 | 0.02 | 0.01 | 77% |
| 6 | Other Works | 12 | 0 | 8 | 0 | 0.05 | 0.01 | 13% |
| 7 | Construction of Recharge Pits | 10 | 0 | 0 | 0 | 0.02 | 0.01 | 64% |
| 8 | Well Recharge | 10 | 0 | 0 | 0 | 0.01 | 0.00 | 25% |
| 9 | Farm Pond | 10 | 0 | 6 | 2 | 0.30 | 0.18 | 62% |
| 10 | Construction of Road and Culvert | 10 | 0 | 9 | 1 | 0.71 | 0.79 | 110% |
| 11 | Cattle Shed | 5 | 0 | 2 | 3 | 0.02 | 0.00 | 7% |
| 12 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 3 | 0 | 3 | 0 | 0.23 | 0.20 | 88% |
| 13 | Construction of Check Dam/Stop Dam | 3 | 0 | 2 | 0 | 0.07 | 0.05 | 72% |
| 14 | Repair & maint of Pond/ Tank | 3 | 0 | 3 | 0 | 0.01 | 0.01 | 87% |
| 15 | Constr of Aganwadi | 2 | 0 | 1 | 0 | 0.02 | 0.01 | 43% |
| 16 | Culvert | 2 | 0 | 2 | 0 | 0.08 | 0.08 | 97% |
| 17 | Construction of Crematorium | 2 | 0 | 2 | 0 | 0.04 | 0.03 | 96% |
| 18 | Constr of Kitchen Shed | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 19 | Terracing | 2 | 0 | 2 | 0 | 0.10 | 0.08 | 86% |
| 20 | Construction of Trench | 1 | 0 | 1 | 0 | 0.21 | 0.25 | 115% |
| 21 | Solid and Liquid Waste Management | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 22 | Construction of Percolation Tank | 1 | 0 | 1 | 0 | 0.09 | 0.05 | 53% |
| 23 | Construction of Play field | 1 | 0 | 1 | 0 | 0.02 | 0.01 | 46% |
| Total | 446 | 49 | 312 | 25 | 4.47 | 3.25 |