| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 283 | 24 | 233 | 0 | 0.53 | 0.46 | 87% |
| 2 | Construction of Toilets | 137 | 0 | 107 | 0 | 0.08 | 0.05 | 60% |
| 3 | Plantation | 112 | 3 | 68 | 23 | 4.11 | 0.67 | 16% |
| 4 | Land Development | 48 | 0 | 48 | 0 | 0.14 | 0.14 | 98% |
| 5 | Construction of Well | 44 | 2 | 39 | 2 | 0.58 | 0.62 | 106% |
| 6 | Well Recharge | 30 | 0 | 0 | 3 | 0.07 | 0.05 | 70% |
| 7 | Constr of Cement Concrete Roads | 22 | 0 | 15 | 4 | 0.17 | 0.15 | 88% |
| 8 | Construction of Road and Culvert | 21 | 1 | 20 | 0 | 2.52 | 1.46 | 58% |
| 9 | Farm Pond | 15 | 2 | 5 | 3 | 0.46 | 0.18 | 39% |
| 10 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 11 | 0 | 9 | 2 | 0.07 | 0.10 | 134% |
| 11 | Construction of Percolation Tank | 6 | 0 | 3 | 3 | 0.29 | 0.11 | 38% |
| 12 | Solid and Liquid Waste Management | 4 | 0 | 1 | 3 | 0.01 | 0.00 | 32% |
| 13 | Construction of Bund | 4 | 0 | 4 | 0 | 0.01 | 0.01 | 66% |
| 14 | Construction of Trench | 3 | 0 | 3 | 0 | 0.01 | 0.03 | 338% |
| 15 | Constr of Aganwadi | 3 | 0 | 2 | 0 | 0.09 | 0.03 | 39% |
| 16 | Cattle Shed | 3 | 0 | 2 | 0 | 0.40 | 0.39 | 97% |
| 17 | Renovation of traditional water bodies | 2 | 0 | 2 | 0 | 0.10 | 0.01 | 8% |
| 18 | Repair & maint of Pond/ Tank | 2 | 0 | 2 | 0 | 0.03 | 0.03 | 83% |
| 19 | Construction of Crematorium | 2 | 0 | 2 | 0 | 0.04 | 0.04 | 99% |
| 20 | Construction of Check Dam/Stop Dam | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 100% |
| 21 | Terracing | 1 | 0 | 1 | 0 | 0.13 | 0.05 | 40% |
| 22 | Culvert | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 99% |
| 23 | Constr of Gabion | 1 | 0 | 1 | 0 | 0.10 | 0.01 | 11% |
| 24 | Construction of Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 25 | Construction of Recharge Pits | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 56% |
| Total | 758 | 32 | 569 | 44 | 9.96 | 4.60 |