| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 74 | 15 | 31 | 4 | 0.15 | 0.05 | 33% |
| 2 | Construction of Road and Culvert | 49 | 0 | 30 | 10 | 1.17 | 1.37 | 117% |
| 3 | Plantation | 23 | 1 | 6 | 9 | 0.27 | 0.05 | 19% |
| 4 | Farm Pond | 12 | 5 | 2 | 0 | 0.33 | 0.21 | 62% |
| 5 | Constr of Cement Concrete Roads | 12 | 0 | 10 | 2 | 0.23 | 0.23 | 101% |
| 6 | Land Development | 10 | 0 | 6 | 1 | 0.17 | 0.12 | 71% |
| 7 | Construction of Check Dam/Stop Dam | 10 | 0 | 2 | 2 | 0.04 | 0.02 | 58% |
| 8 | Solid and Liquid Waste Management | 10 | 0 | 4 | 6 | 0.01 | 0.00 | 7% |
| 9 | Construction of Tank | 10 | 3 | 5 | 1 | 0.63 | 0.39 | 61% |
| 10 | Well Recharge | 9 | 0 | 7 | 2 | 0.07 | 0.06 | 83% |
| 11 | Constr of GP Bhawan | 7 | 3 | 3 | 1 | 0.17 | 0.14 | 81% |
| 12 | Construction of Trench | 7 | 0 | 5 | 2 | 0.16 | 0.13 | 80% |
| 13 | Construction of Well | 5 | 0 | 1 | 0 | 0.11 | 0.04 | 39% |
| 14 | Construction of Recharge Pits | 5 | 0 | 0 | 4 | 0.00 | 0.00 | 0% |
| 15 | Construction of Percolation Tank | 4 | 0 | 2 | 1 | 0.09 | 0.07 | 73% |
| 16 | Construction of NADEP/Vermi Compost Pit | 3 | 0 | 2 | 1 | 0.00 | 0.00 | 39% |
| 17 | Boulder Check/Gully Plug | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 18 | Repaire and Maint of NADEP/Vermi Compost Pit | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 19 | Repair & maint of Percolation Tank | 2 | 0 | 1 | 1 | 0.03 | 0.03 | 97% |
| 20 | Terracing | 2 | 0 | 2 | 0 | 0.06 | 0.06 | 92% |
| 21 | Roof Water Harvesting on gov/panchayat bldg | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 22 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 23 | Construction of Spur | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 87% |
| 24 | Constr of Aganwadi | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 82% |
| 25 | Repair & maint of Water Harvesting Structures | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 89% |
| Total | 263 | 27 | 122 | 52 | 3.74 | 3.00 |