| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 140 | 26 | 91 | 1 | 0.31 | 0.21 | 70% |
| 2 | Construction of Trench | 78 | 0 | 48 | 11 | 1.03 | 0.49 | 47% |
| 3 | Land Development | 42 | 0 | 26 | 7 | 0.04 | 0.15 | 417% |
| 4 | Construction of Percolation Tank | 25 | 0 | 15 | 10 | 1.66 | 1.61 | 97% |
| 5 | Farm Pond | 23 | 2 | 3 | 2 | 0.08 | 0.08 | 107% |
| 6 | Well Recharge | 22 | 2 | 11 | 0 | 0.27 | 0.07 | 25% |
| 7 | Construction of Check Dam/Stop Dam | 22 | 0 | 14 | 4 | 0.90 | 0.77 | 85% |
| 8 | Construction of Well | 21 | 6 | 2 | 12 | 0.24 | 0.11 | 47% |
| 9 | Construction of Road and Culvert | 21 | 0 | 15 | 4 | 2.32 | 2.09 | 90% |
| 10 | Construction of Bund | 16 | 1 | 11 | 4 | 0.10 | 0.03 | 28% |
| 11 | Construction of Tank | 14 | 0 | 0 | 11 | 0.14 | 0.14 | 97% |
| 12 | Boulder Check/Gully Plug | 12 | 0 | 10 | 1 | 0.13 | 0.07 | 53% |
| 13 | Plantation | 8 | 1 | 2 | 5 | 0.11 | 0.01 | 11% |
| 14 | Construction of NADEP/Vermi Compost Pit | 8 | 0 | 1 | 7 | 0.01 | 0.00 | 12% |
| 15 | Constr of Cement Concrete Roads | 8 | 0 | 3 | 0 | 0.06 | 0.03 | 53% |
| 16 | Constr of Gabion | 7 | 0 | 4 | 0 | 0.06 | 0.04 | 65% |
| 17 | Roof Water Harvesting on gov/panchayat bldg | 6 | 0 | 3 | 3 | 0.01 | 0.01 | 39% |
| 18 | Solid and Liquid Waste Management | 5 | 0 | 0 | 5 | 0.00 | 0.00 | 0% |
| 19 | Constr of Kitchen Shed | 3 | 0 | 1 | 2 | 0.01 | 0.00 | 0% |
| 20 | Construction of Crematorium | 3 | 0 | 3 | 0 | 0.05 | 0.03 | 63% |
| 21 | Repair & maint of Road | 1 | 0 | 1 | 0 | 0.08 | 0.08 | 99% |
| 22 | Construction of Embankment | 1 | 1 | 0 | 0 | 0.14 | 0.13 | 94% |
| 23 | Terracing | 1 | 0 | 1 | 0 | 0.02 | 0.01 | 81% |
| 24 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| Total | 488 | 39 | 265 | 90 | 7.78 | 6.16 |