| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 143 | 9 | 111 | 2 | 0.28 | 0.24 | 86% |
| 2 | Plantation | 94 | 10 | 63 | 11 | 2.11 | 0.67 | 32% |
| 3 | Constr of Cement Concrete Roads | 36 | 2 | 25 | 3 | 0.31 | 0.22 | 73% |
| 4 | Construction of Well | 33 | 0 | 20 | 2 | 0.59 | 0.43 | 72% |
| 5 | Construction of Check Dam/Stop Dam | 28 | 0 | 22 | 3 | 0.71 | 0.51 | 73% |
| 6 | Land Development | 23 | 0 | 19 | 0 | 0.07 | 0.05 | 68% |
| 7 | Construction of Road and Culvert | 20 | 1 | 14 | 2 | 1.74 | 1.33 | 77% |
| 8 | Solid and Liquid Waste Management | 14 | 4 | 4 | 6 | 0.03 | 0.01 | 43% |
| 9 | Construction of Bund | 12 | 0 | 9 | 0 | 0.02 | 0.01 | 44% |
| 10 | Construction of Toilets | 10 | 0 | 7 | 0 | 0.18 | 0.10 | 59% |
| 11 | Well Recharge | 8 | 0 | 1 | 0 | 0.04 | 0.03 | 81% |
| 12 | Construction of Percolation Tank | 7 | 1 | 3 | 3 | 0.10 | 0.03 | 31% |
| 13 | Construction of Tank | 7 | 0 | 3 | 2 | 0.16 | 0.08 | 48% |
| 14 | Farm Pond | 6 | 0 | 2 | 0 | 0.10 | 0.06 | 62% |
| 15 | Construction of Crematorium | 3 | 0 | 3 | 0 | 0.05 | 0.05 | 94% |
| 16 | Boulder Check/Gully Plug | 3 | 0 | 2 | 1 | 0.04 | 0.03 | 65% |
| 17 | Roof Water Harvesting on gov/panchayat bldg | 3 | 2 | 0 | 1 | 0.02 | 0.00 | 4% |
| 18 | Strengthening of Embankment | 2 | 0 | 2 | 0 | 0.01 | 0.00 | 25% |
| 19 | Constr of GP Bhawan | 2 | 0 | 1 | 1 | 0.13 | 0.10 | 76% |
| 20 | Works for Flood Control and Protection | 1 | 0 | 1 | 0 | 0.03 | 0.02 | 73% |
| 21 | Construction of NADEP/Vermi Compost Pit | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 100% |
| 22 | Construction of Play field | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 88% |
| 23 | Construction of Trench | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 45% |
| 24 | Repair & Maint of Bund | 1 | 0 | 0 | 0 | 0.01 | 0.01 | 56% |
| 25 | Repair & maint of Percolation Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| Total | 460 | 29 | 315 | 38 | 6.76 | 4.01 |