| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction of Check Dam/Stop Dam | 21 | 0 | 20 | 0 | 41.92 | 20.96 | 50% |
| 2 | Farm Pond | 17 | 1 | 7 | 0 | 39.89 | 13.00 | 33% |
| 3 | Construction of Well | 14 | 0 | 0 | 2 | 6.52 | 4.74 | 73% |
| 4 | Land Development | 11 | 0 | 10 | 0 | 4.97 | 4.45 | 90% |
| 5 | Constr of Cement Concrete Roads | 10 | 0 | 6 | 1 | 7.69 | 5.41 | 70% |
| 6 | Construction of Road and Culvert | 9 | 0 | 7 | 0 | 43.50 | 19.68 | 45% |
| 7 | Cattle Shed | 7 | 0 | 7 | 0 | 8.26 | 3.81 | 46% |
| 8 | Construction of NADEP/Vermi Compost Pit | 6 | 0 | 0 | 0 | 0.37 | 0.00 | 0% |
| 9 | Construction of Crematorium | 4 | 0 | 0 | 3 | 3.18 | 0.00 | 0% |
| 10 | Renovation of traditional water bodies | 3 | 0 | 3 | 0 | 4.82 | 3.77 | 78% |
| 11 | Construction of Toilets | 3 | 0 | 2 | 0 | 1.32 | 0.15 | 11% |
| 12 | Construction of Play field | 2 | 0 | 0 | 1 | 9.05 | 7.36 | 81% |
| 13 | Construction of Percolation Tank | 2 | 0 | 1 | 0 | 5.60 | 2.83 | 50% |
| 14 | Plantation | 2 | 0 | 2 | 0 | 4.90 | 12.84 | 262% |
| 15 | Well Recharge | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 16 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 17 | Rural Housing | 1 | 0 | 0 | 1 | 0.15 | 0.00 | 0% |
| 18 | Strengthening of Embankment | 1 | 0 | 1 | 0 | 22.38 | 18.22 | 81% |
| Total | 115 | 1 | 66 | 9 | 204.53 | 117.20 |