| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 192 | 0 | 189 | 0 | 0.32 | 0.29 | 92% |
| 2 | Construction of Well | 67 | 5 | 35 | 16 | 1.23 | 0.91 | 74% |
| 3 | Construction of Road and Culvert | 35 | 0 | 20 | 5 | 1.27 | 0.72 | 57% |
| 4 | Construction of Check Dam/Stop Dam | 31 | 0 | 29 | 2 | 0.47 | 0.48 | 101% |
| 5 | Constr of Cement Concrete Roads | 26 | 0 | 20 | 2 | 0.47 | 0.35 | 74% |
| 6 | Cattle Shed | 15 | 0 | 12 | 3 | 0.14 | 0.08 | 54% |
| 7 | Plantation | 13 | 0 | 6 | 3 | 0.22 | 0.03 | 15% |
| 8 | Well Recharge | 11 | 2 | 0 | 0 | 0.02 | 0.00 | 0% |
| 9 | Farm Pond | 8 | 0 | 5 | 1 | 0.11 | 0.07 | 65% |
| 10 | Repair & maint of Pond/ Tank | 6 | 0 | 2 | 2 | 0.28 | 0.24 | 88% |
| 11 | Construction of Recharge Pits | 4 | 0 | 0 | 4 | 0.00 | 0.00 | 0% |
| 12 | Land Development | 4 | 0 | 4 | 0 | 0.17 | 0.17 | 104% |
| 13 | Solid and Liquid Waste Management | 3 | 0 | 0 | 3 | 0.00 | 0.00 | 0% |
| 14 | Deepening / Desilting of Flood Channels | 3 | 0 | 3 | 0 | 0.10 | 0.12 | 115% |
| 15 | Renovation of traditional water bodies | 3 | 0 | 0 | 3 | 0.00 | 0.00 | 0% |
| 16 | Construction of Percolation Tank | 2 | 0 | 2 | 0 | 0.09 | 0.07 | 74% |
| 17 | Constr of Compound wall | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 18 | Terracing | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 19 | Works for Flood Control and Protection | 1 | 0 | 1 | 0 | 0.05 | 0.00 | 5% |
| 20 | Construction of Trench | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 21 | Bio-Fertilizer | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| Total | 430 | 7 | 328 | 50 | 4.94 | 3.52 |