| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 175 | 1 | 169 | 0 | 28.16 | 26.90 | 96% |
| 2 | Plantation | 47 | 3 | 18 | 3 | 28.35 | 4.40 | 16% |
| 3 | Constr of Cement Concrete Roads | 46 | 5 | 23 | 12 | 19.46 | 14.44 | 74% |
| 4 | Construction of Toilets | 33 | 1 | 21 | 11 | 5.02 | 1.71 | 34% |
| 5 | Construction of Bund | 27 | 0 | 10 | 17 | 3.31 | 1.53 | 46% |
| 6 | Construction of NADEP/Vermi Compost Pit | 21 | 0 | 12 | 9 | 2.10 | 1.61 | 77% |
| 7 | Solid and Liquid Waste Management | 11 | 1 | 0 | 10 | 0.88 | 0.07 | 7% |
| 8 | Construction of Recharge Pits | 7 | 0 | 0 | 2 | 0.78 | 0.75 | 96% |
| 9 | Roof Water Harvesting on gov/panchayat bldg | 5 | 0 | 3 | 2 | 0.43 | 0.44 | 102% |
| 10 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 5 | 0 | 0 | 5 | 0.00 | 0.00 | 0% |
| 11 | Cattle Shed | 4 | 0 | 3 | 0 | 5.29 | 2.79 | 53% |
| 12 | Constr of Aganwadi | 4 | 0 | 3 | 1 | 3.71 | 3.69 | 100% |
| 13 | Constr of Compound wall | 4 | 0 | 2 | 2 | 2.53 | 2.13 | 84% |
| 14 | Construction of Road and Culvert | 4 | 0 | 0 | 4 | 0.00 | 0.00 | 0% |
| 15 | Construction of Check Dam/Stop Dam | 3 | 0 | 2 | 0 | 6.10 | 2.39 | 39% |
| 16 | Construction of building/workshed for SHG | 3 | 0 | 0 | 2 | 10.00 | 9.33 | 93% |
| 17 | Works for Flood Control and Protection | 3 | 0 | 1 | 2 | 0.68 | 0.46 | 67% |
| 18 | Constr of GP Bhawan | 2 | 0 | 1 | 1 | 10.00 | 9.94 | 99% |
| 19 | Repair & Maint of Bund | 2 | 0 | 1 | 1 | 0.14 | 0.14 | 99% |
| 20 | Terracing | 1 | 0 | 1 | 0 | 0.57 | 0.30 | 52% |
| 21 | Repair & maint of Road | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 22 | Construction of Crematorium | 1 | 0 | 1 | 0 | 2.45 | 2.46 | 100% |
| 23 | Repair & maint of Percolation Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 24 | Repair & maint of Pond/ Tank | 1 | 0 | 0 | 1 | 1.11 | 0.00 | 0% |
| 25 | Culvert | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| Total | 412 | 11 | 271 | 87 | 131.07 | 85.46 |