| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Constr of Cement Concrete Roads | 36 | 0 | 27 | 4 | 7.78 | 6.84 | 88% |
| 2 | Rural Housing | 34 | 0 | 32 | 0 | 5.36 | 4.99 | 93% |
| 3 | Plantation | 15 | 1 | 8 | 4 | 34.75 | 8.62 | 25% |
| 4 | Construction of Check Dam/Stop Dam | 13 | 0 | 7 | 4 | 14.40 | 10.14 | 70% |
| 5 | Construction of Trench | 10 | 0 | 5 | 5 | 1.36 | 0.92 | 68% |
| 6 | Construction of Well | 7 | 0 | 5 | 1 | 5.83 | 2.26 | 39% |
| 7 | Land Development | 6 | 0 | 6 | 0 | 2.38 | 1.09 | 46% |
| 8 | Cattle Shed | 5 | 0 | 4 | 1 | 5.75 | 4.22 | 73% |
| 9 | Terracing | 5 | 0 | 5 | 0 | 1.41 | 0.95 | 67% |
| 10 | Construction of NADEP/Vermi Compost Pit | 4 | 0 | 0 | 4 | 0.66 | 0.00 | 0% |
| 11 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 4 | 0 | 2 | 0 | 0.20 | 0.20 | 99% |
| 12 | Construction of Recharge Pits | 4 | 0 | 1 | 3 | 0.41 | 0.19 | 47% |
| 13 | Constr of Aganwadi | 3 | 0 | 1 | 1 | 3.69 | 1.77 | 48% |
| 14 | Farm Pond | 3 | 1 | 0 | 1 | 5.88 | 0.90 | 15% |
| 15 | Construction of Road and Culvert | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 16 | Constr of Compound wall | 2 | 0 | 1 | 1 | 0.21 | 0.20 | 96% |
| 17 | Constr of Gabion | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 18 | Construction of Embankment | 2 | 0 | 0 | 2 | 3.30 | 0.00 | 0% |
| 19 | Construction of Play field | 2 | 0 | 2 | 0 | 3.02 | 1.29 | 43% |
| 20 | Roof Water Harvesting on gov/panchayat bldg | 2 | 0 | 1 | 1 | 0.29 | 0.29 | 100% |
| 21 | Works for Flood Control and Protection | 1 | 0 | 1 | 0 | 0.59 | 0.54 | 91% |
| 22 | Construction of Crematorium | 1 | 0 | 1 | 0 | 1.80 | 1.73 | 96% |
| 23 | Constr of GP Bhawan | 1 | 0 | 1 | 0 | 10.00 | 9.95 | 100% |
| 24 | Well Recharge | 1 | 0 | 1 | 0 | 0.18 | 0.18 | 100% |
| 25 | Construction of Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| Total | 166 | 2 | 111 | 37 | 109.22 | 57.26 |