| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 163 | 5 | 134 | 0 | 0.31 | 0.24 | 80% |
| 2 | Construction of Toilets | 63 | 0 | 58 | 0 | 0.05 | 0.03 | 72% |
| 3 | Plantation | 31 | 3 | 13 | 0 | 0.59 | 0.16 | 28% |
| 4 | Constr of Cement Concrete Roads | 24 | 1 | 19 | 0 | 0.13 | 0.13 | 98% |
| 5 | Land Development | 21 | 0 | 6 | 0 | 0.05 | 0.04 | 80% |
| 6 | Construction of NADEP/Vermi Compost Pit | 19 | 0 | 7 | 11 | 0.07 | 0.04 | 57% |
| 7 | Construction of Road and Culvert | 13 | 2 | 8 | 1 | 1.29 | 0.67 | 52% |
| 8 | Construction of Percolation Tank | 12 | 0 | 2 | 10 | 0.08 | 0.01 | 7% |
| 9 | Construction of Bund | 11 | 0 | 8 | 2 | 0.20 | 0.08 | 39% |
| 10 | Terracing | 9 | 0 | 1 | 7 | 0.01 | 0.00 | 26% |
| 11 | Solid and Liquid Waste Management | 6 | 0 | 4 | 1 | 0.02 | 0.01 | 83% |
| 12 | Construction of Fish Drying Infrastructure | 5 | 0 | 4 | 0 | 0.09 | 0.05 | 56% |
| 13 | Farm Pond | 4 | 0 | 4 | 0 | 0.12 | 0.06 | 48% |
| 14 | Renovation of traditional water bodies | 2 | 0 | 2 | 0 | 0.07 | 0.07 | 95% |
| 15 | Construction of Play field | 2 | 0 | 2 | 0 | 0.07 | 0.05 | 77% |
| 16 | Construction of Tank | 2 | 0 | 2 | 0 | 0.07 | 0.06 | 95% |
| 17 | Construction of Trench | 2 | 0 | 2 | 0 | 0.01 | 0.00 | 69% |
| 18 | Constr of Food Grain storage | 2 | 0 | 1 | 0 | 0.13 | 0.13 | 99% |
| 19 | Works for Flood Control and Protection | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 70% |
| 20 | Construction of Check Dam/Stop Dam | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 21 | Culvert | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 100% |
| 22 | Well Recharge | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 56% |
| 23 | Constr of Aganwadi | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 95% |
| Total | 396 | 11 | 281 | 33 | 3.35 | 1.87 |