| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 252 | 29 | 214 | 0 | 0.45 | 0.41 | 91% |
| 2 | Constr of Cement Concrete Roads | 53 | 0 | 41 | 8 | 0.23 | 0.22 | 96% |
| 3 | Land Development | 48 | 0 | 33 | 15 | 0.11 | 0.10 | 92% |
| 4 | Construction of NADEP/Vermi Compost Pit | 35 | 0 | 6 | 29 | 0.02 | 0.02 | 95% |
| 5 | Plantation | 33 | 0 | 30 | 3 | 0.54 | 0.13 | 25% |
| 6 | Construction of Bund | 25 | 0 | 20 | 4 | 0.35 | 0.23 | 66% |
| 7 | Construction of Toilets | 15 | 0 | 15 | 0 | 0.02 | 0.02 | 100% |
| 8 | Construction of Road and Culvert | 12 | 1 | 5 | 3 | 1.03 | 0.46 | 45% |
| 9 | Solid and Liquid Waste Management | 8 | 0 | 7 | 1 | 0.02 | 0.02 | 86% |
| 10 | Works for Flood Control and Protection | 6 | 0 | 4 | 0 | 0.01 | 0.00 | 39% |
| 11 | Roof Water Harvesting on gov/panchayat bldg | 6 | 0 | 4 | 2 | 0.01 | 0.01 | 92% |
| 12 | Farm Pond | 5 | 0 | 5 | 0 | 0.08 | 0.05 | 68% |
| 13 | Boulder Check/Gully Plug | 5 | 0 | 5 | 0 | 0.01 | 0.01 | 90% |
| 14 | Construction of Percolation Tank | 4 | 0 | 2 | 1 | 0.07 | 0.04 | 60% |
| 15 | Goat Shelter | 3 | 0 | 0 | 3 | 0.01 | 0.00 | 0% |
| 16 | Construction of Recharge Pits | 3 | 0 | 1 | 2 | 0.00 | 0.00 | 100% |
| 17 | Repair & maint of Pond/ Tank | 3 | 0 | 1 | 2 | 0.05 | 0.01 | 19% |
| 18 | Construction of Embankment | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 19 | Construction of Play field | 2 | 1 | 0 | 0 | 0.08 | 0.01 | 15% |
| 20 | Constr of Kitchen Shed | 2 | 0 | 2 | 0 | 0.01 | 0.00 | 89% |
| 21 | Culvert | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 100% |
| 22 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 1 | 0 | 0.03 | 0.01 | 39% |
| 23 | Construction of Trench | 1 | 0 | 1 | 0 | 0.01 | 0.00 | 21% |
| 24 | Constr of Food Grain storage | 1 | 0 | 0 | 0 | 0.13 | 0.00 | 2% |
| 25 | Constr of Compound wall | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 100% |
| 26 | Renovation of traditional water bodies | 1 | 0 | 1 | 0 | 0.01 | 0.00 | 68% |
| 27 | Construction of Spur | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 99% |
| 28 | Construction of Check Dam/Stop Dam | 1 | 0 | 1 | 0 | 0.06 | 0.00 | 0% |
| 29 | Constr of Aganwadi | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 100% |
| 30 | Community Sanitary Complex | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 98% |
| 31 | Construction of Crematorium | 1 | 0 | 1 | 0 | 0.05 | 0.03 | 63% |
| Total | 533 | 31 | 405 | 73 | 3.43 | 1.86 |