| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 207 | 3 | 198 | 0 | 36.30 | 35.01 | 96% |
| 2 | Construction of Toilets | 83 | 0 | 76 | 0 | 8.86 | 8.18 | 92% |
| 3 | Land Development | 40 | 0 | 29 | 5 | 18.66 | 3.69 | 20% |
| 4 | Farm Pond | 33 | 0 | 6 | 18 | 19.26 | 8.43 | 44% |
| 5 | Plantation | 23 | 3 | 15 | 2 | 62.35 | 5.48 | 9% |
| 6 | Constr of Cement Concrete Roads | 17 | 0 | 15 | 0 | 10.39 | 7.65 | 74% |
| 7 | Construction of Bund | 13 | 0 | 10 | 3 | 5.89 | 4.20 | 71% |
| 8 | Construction of Road and Culvert | 12 | 0 | 6 | 3 | 19.45 | 2.11 | 11% |
| 9 | Construction of Trench | 8 | 0 | 6 | 2 | 10.74 | 7.07 | 66% |
| 10 | Construction of NADEP/Vermi Compost Pit | 5 | 0 | 0 | 5 | 0.48 | 0.00 | 0% |
| 11 | Solid and Liquid Waste Management | 5 | 1 | 2 | 1 | 1.22 | 1.09 | 89% |
| 12 | Construction of Tank | 3 | 0 | 1 | 2 | 0.95 | 0.38 | 40% |
| 13 | Works for Flood Control and Protection | 2 | 0 | 2 | 0 | 2.29 | 2.27 | 99% |
| 14 | Constr of GP Bhawan | 2 | 0 | 2 | 0 | 15.19 | 10.85 | 71% |
| 15 | Construction of Percolation Tank | 2 | 0 | 1 | 1 | 4.84 | 2.28 | 47% |
| 16 | Construction of Play field | 2 | 0 | 0 | 1 | 2.98 | 0.00 | 0% |
| 17 | Construction of Recharge Pits | 2 | 0 | 0 | 2 | 0.14 | 0.00 | 0% |
| 18 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 19 | Repair & Maint of Bund | 1 | 0 | 1 | 0 | 1.18 | 0.38 | 32% |
| 20 | Repair & maint of Percolation Tank | 1 | 0 | 0 | 1 | 0.14 | 0.00 | 0% |
| 21 | Construction of Check Dam/Stop Dam | 1 | 0 | 1 | 0 | 0.11 | 0.10 | 97% |
| 22 | Cattle Shed | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 23 | Bio-Fertilizer | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| Total | 465 | 7 | 371 | 48 | 221.41 | 99.18 |