| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 346 | 23 | 304 | 0 | 0.68 | 0.61 | 90% |
| 2 | Farm Pond | 325 | 3 | 317 | 1 | 1.07 | 0.84 | 78% |
| 3 | Land Development | 71 | 0 | 57 | 9 | 0.36 | 0.25 | 70% |
| 4 | Plantation | 64 | 6 | 45 | 3 | 1.12 | 0.28 | 25% |
| 5 | Construction of Bund | 63 | 2 | 40 | 17 | 0.56 | 0.37 | 66% |
| 6 | Construction of Toilets | 53 | 0 | 11 | 0 | 0.03 | 0.00 | 8% |
| 7 | Construction of Check Dam/Stop Dam | 37 | 0 | 19 | 3 | 0.56 | 0.15 | 27% |
| 8 | Construction of Well | 25 | 0 | 23 | 2 | 0.34 | 0.28 | 83% |
| 9 | Construction of Road and Culvert | 23 | 0 | 12 | 1 | 0.68 | 0.37 | 55% |
| 10 | Constr of Cement Concrete Roads | 18 | 0 | 13 | 1 | 0.14 | 0.10 | 73% |
| 11 | Solid and Liquid Waste Management | 16 | 0 | 11 | 0 | 0.01 | 0.00 | 35% |
| 12 | Construction of NADEP/Vermi Compost Pit | 10 | 1 | 0 | 9 | 0.01 | 0.00 | 4% |
| 13 | Cattle Shed | 9 | 1 | 6 | 2 | 0.09 | 0.05 | 59% |
| 14 | Works for Flood Control and Protection | 9 | 1 | 6 | 2 | 0.22 | 0.13 | 62% |
| 15 | Construction of Recharge Pits | 8 | 0 | 0 | 7 | 0.04 | 0.00 | 0% |
| 16 | Repair & maint of Pond/ Tank | 6 | 0 | 4 | 1 | 0.39 | 0.33 | 83% |
| 17 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 4 | 0 | 2 | 2 | 0.08 | 0.04 | 45% |
| 18 | Renovation of traditional water bodies | 4 | 0 | 3 | 0 | 0.09 | 0.08 | 91% |
| 19 | Terracing | 4 | 0 | 2 | 2 | 0.12 | 0.02 | 18% |
| 20 | Repair & maint of Water Harvesting Structures | 3 | 0 | 3 | 0 | 0.04 | 0.03 | 65% |
| 21 | Deepening / Desilting of Flood Channels | 3 | 0 | 3 | 0 | 0.09 | 0.07 | 85% |
| 22 | Construction of Crematorium | 2 | 0 | 2 | 0 | 0.04 | 0.04 | 99% |
| 23 | Construction of Play field | 2 | 0 | 2 | 0 | 0.07 | 0.04 | 57% |
| 24 | Construction of Percolation Tank | 2 | 0 | 1 | 1 | 0.04 | 0.03 | 78% |
| 25 | Constr of Compound wall | 2 | 0 | 0 | 1 | 0.11 | 0.00 | 0% |
| 26 | Construction of Tank | 2 | 0 | 2 | 0 | 0.09 | 0.08 | 87% |
| 27 | Boulder Check/Gully Plug | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 94% |
| 28 | Construction of Trench | 1 | 0 | 1 | 0 | 0.04 | 0.04 | 83% |
| 29 | Strengthening of Embankment | 1 | 0 | 0 | 0 | 0.03 | 0.00 | 0% |
| 30 | Goat Shelter | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| Total | 1,115 | 37 | 890 | 65 | 7.12 | 4.23 |