| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 467 | 8 | 443 | 4 | 0.89 | 0.83 | 93% |
| 2 | Construction of Bund | 282 | 0 | 218 | 9 | 2.26 | 1.63 | 72% |
| 3 | Construction of Check Dam/Stop Dam | 237 | 2 | 220 | 2 | 16.84 | 1.53 | 9% |
| 4 | Construction of Trench | 67 | 0 | 65 | 0 | 0.58 | 0.23 | 40% |
| 5 | Construction of Well | 47 | 5 | 25 | 9 | 0.97 | 0.57 | 58% |
| 6 | Farm Pond | 37 | 2 | 24 | 4 | 0.93 | 0.51 | 55% |
| 7 | Land Development | 27 | 0 | 22 | 4 | 0.29 | 0.23 | 79% |
| 8 | Plantation | 21 | 2 | 13 | 0 | 0.18 | 0.05 | 26% |
| 9 | Construction of Road and Culvert | 14 | 0 | 7 | 1 | 1.03 | 0.60 | 58% |
| 10 | Works for Flood Control and Protection | 13 | 0 | 9 | 0 | 0.32 | 0.18 | 58% |
| 11 | Cattle Shed | 13 | 0 | 3 | 10 | 0.12 | 0.01 | 11% |
| 12 | Repair & maint of Pond/ Tank | 12 | 0 | 2 | 8 | 0.19 | 0.12 | 64% |
| 13 | Solid and Liquid Waste Management | 12 | 0 | 11 | 0 | 0.06 | 0.04 | 74% |
| 14 | Constr of Cement Concrete Roads | 11 | 0 | 6 | 4 | 0.07 | 0.05 | 77% |
| 15 | Construction of NADEP/Vermi Compost Pit | 9 | 0 | 9 | 0 | 0.18 | 0.09 | 50% |
| 16 | Deepening / Desilting of Flood Channels | 9 | 0 | 5 | 0 | 5.82 | 0.29 | 5% |
| 17 | Boulder Check/Gully Plug | 6 | 0 | 6 | 0 | 0.02 | 0.01 | 75% |
| 18 | Well Recharge | 5 | 0 | 5 | 0 | 0.03 | 0.03 | 91% |
| 19 | Culvert | 4 | 0 | 2 | 0 | 4.95 | 0.03 | 1% |
| 20 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 4 | 0 | 3 | 0 | 0.18 | 0.14 | 79% |
| 21 | Construction of Play field | 3 | 0 | 1 | 0 | 0.05 | 0.02 | 37% |
| 22 | Construction of Percolation Tank | 3 | 0 | 3 | 0 | 0.13 | 0.09 | 68% |
| 23 | Goat Shelter | 2 | 0 | 2 | 0 | 0.01 | 0.01 | 90% |
| 24 | Construction of Crematorium | 2 | 0 | 0 | 0 | 0.04 | 0.00 | 0% |
| 25 | Other Works | 2 | 0 | 2 | 0 | 0.01 | 0.01 | 89% |
| 26 | Constr of GP Bhawan | 1 | 0 | 1 | 0 | 0.13 | 0.09 | 67% |
| 27 | Roof Water Harvesting on gov/panchayat bldg | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 81% |
| 28 | Constr of Aganwadi | 1 | 1 | 0 | 0 | 0.05 | 0.04 | 75% |
| 29 | Construction of Other Community Building/Assets | 1 | 0 | 0 | 0 | 0.02 | 0.00 | 0% |
| 30 | Renovation of traditional water bodies | 1 | 0 | 1 | 0 | 0.04 | 0.02 | 35% |
| 31 | Repair & Maint of Community infrastructure | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| Total | 1,315 | 20 | 1,109 | 55 | 36.39 | 7.44 |