| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 218 | 17 | 192 | 4 | 0.43 | 0.37 | 84% |
| 2 | Construction of Check Dam/Stop Dam | 132 | 0 | 121 | 9 | 19.26 | 0.68 | 4% |
| 3 | Construction of Bund | 109 | 0 | 75 | 28 | 1.52 | 1.15 | 76% |
| 4 | Farm Pond | 74 | 2 | 55 | 0 | 1.20 | 0.77 | 64% |
| 5 | Land Development | 61 | 0 | 37 | 21 | 0.74 | 0.51 | 69% |
| 6 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 38 | 0 | 35 | 1 | 0.35 | 0.17 | 49% |
| 7 | Construction of Well | 28 | 0 | 19 | 6 | 0.67 | 0.36 | 53% |
| 8 | Plantation | 25 | 7 | 9 | 6 | 0.35 | 0.09 | 24% |
| 9 | Well Recharge | 20 | 0 | 6 | 8 | 0.45 | 0.18 | 40% |
| 10 | Construction of Toilets | 20 | 0 | 15 | 0 | 0.06 | 0.02 | 33% |
| 11 | Construction of NADEP/Vermi Compost Pit | 16 | 0 | 16 | 0 | 0.19 | 0.15 | 77% |
| 12 | Construction of Trench | 15 | 0 | 13 | 0 | 0.17 | 0.22 | 127% |
| 13 | Construction of Road and Culvert | 11 | 0 | 8 | 3 | 3.26 | 0.37 | 11% |
| 14 | Constr of Cement Concrete Roads | 8 | 0 | 5 | 1 | 0.08 | 0.05 | 60% |
| 15 | Deepening / Desilting of Flood Channels | 6 | 0 | 6 | 0 | 0.37 | 0.14 | 37% |
| 16 | Constr of Gabion | 6 | 0 | 0 | 6 | 0.02 | 0.00 | 0% |
| 17 | Works for Flood Control and Protection | 4 | 0 | 2 | 0 | 0.02 | 0.00 | 8% |
| 18 | Construction of Tank | 3 | 1 | 1 | 1 | 0.52 | 0.49 | 95% |
| 19 | Cattle Shed | 3 | 0 | 3 | 0 | 0.02 | 0.02 | 86% |
| 20 | Boulder Check/Gully Plug | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 21 | Construction of Percolation Tank | 2 | 0 | 2 | 0 | 0.20 | 0.16 | 83% |
| 22 | Repair & maint of Pond/ Tank | 2 | 0 | 2 | 0 | 0.09 | 0.09 | 97% |
| 23 | Renovation of traditional water bodies | 1 | 0 | 1 | 0 | 0.10 | 0.07 | 76% |
| 24 | Construction of Play field | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 73% |
| 25 | Constr of Kitchen Shed | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 26 | Underground Dyke for Ground Water Recharge | 1 | 0 | 0 | 0 | 0.02 | 0.01 | 36% |
| 27 | Other Works | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 91% |
| 28 | Construction of Crematorium | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| Total | 809 | 27 | 625 | 97 | 30.11 | 6.06 |