| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 163 | 11 | 135 | 1 | 32.09 | 26.87 | 84% |
| 2 | Construction of Toilets | 66 | 0 | 49 | 0 | 6.13 | 4.44 | 73% |
| 3 | Construction of Bund | 25 | 0 | 19 | 1 | 25.06 | 17.00 | 68% |
| 4 | Plantation | 18 | 1 | 12 | 0 | 30.51 | 7.12 | 23% |
| 5 | Solid and Liquid Waste Management | 15 | 0 | 1 | 8 | 2.72 | 0.05 | 2% |
| 6 | Construction of Road and Culvert | 13 | 0 | 10 | 0 | 64.39 | 35.09 | 55% |
| 7 | Constr of Cement Concrete Roads | 8 | 0 | 5 | 0 | 3.30 | 1.82 | 55% |
| 8 | Construction of Check Dam/Stop Dam | 8 | 0 | 8 | 0 | 16.74 | 11.65 | 70% |
| 9 | Well Recharge | 7 | 0 | 0 | 0 | 1.28 | 0.49 | 39% |
| 10 | Culvert | 5 | 0 | 2 | 0 | 12.12 | 11.63 | 96% |
| 11 | Farm Pond | 4 | 0 | 4 | 0 | 4.16 | 2.18 | 53% |
| 12 | Construction of Well | 3 | 0 | 0 | 1 | 4.45 | 0.00 | 0% |
| 13 | Construction of NADEP/Vermi Compost Pit | 3 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 14 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 3 | 0 | 2 | 0 | 8.28 | 5.97 | 72% |
| 15 | Constr of GP Bhawan | 3 | 0 | 1 | 0 | 7.60 | 1.97 | 26% |
| 16 | Land Development | 3 | 0 | 2 | 0 | 9.92 | 8.24 | 83% |
| 17 | Goat Shelter | 3 | 0 | 0 | 0 | 1.43 | 0.02 | 2% |
| 18 | Construction of Canal | 2 | 0 | 0 | 1 | 4.63 | 0.00 | 0% |
| 19 | Construction of Crematorium | 2 | 0 | 2 | 0 | 3.72 | 3.45 | 93% |
| 20 | Works for Flood Control and Protection | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 21 | Constr of Kitchen Shed | 1 | 0 | 1 | 0 | 0.16 | 0.13 | 82% |
| 22 | Grass Land Development | 1 | 0 | 1 | 0 | 0.64 | 0.24 | 37% |
| 23 | Repair & maint of Pond/ Tank | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 24 | Repair & maint of Water Harvesting Structures | 1 | 0 | 1 | 0 | 5.57 | 5.08 | 91% |
| 25 | Cattle Shed | 1 | 0 | 1 | 0 | 1.01 | 0.86 | 85% |
| Total | 360 | 12 | 256 | 13 | 245.90 | 144.33 |