| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 216 | 1 | 209 | 0 | 0.41 | 0.39 | 94% |
| 2 | Construction of Bund | 70 | 0 | 55 | 1 | 0.83 | 0.58 | 70% |
| 3 | Plantation | 50 | 0 | 45 | 1 | 0.59 | 0.36 | 61% |
| 4 | Construction of Toilets | 24 | 0 | 18 | 0 | 0.01 | 0.01 | 78% |
| 5 | Construction of Well | 21 | 0 | 12 | 0 | 0.43 | 0.31 | 71% |
| 6 | Construction of Road and Culvert | 20 | 0 | 13 | 0 | 1.14 | 0.64 | 57% |
| 7 | Cattle Shed | 15 | 0 | 9 | 1 | 0.12 | 0.09 | 74% |
| 8 | Well Recharge | 14 | 0 | 1 | 0 | 0.06 | 0.05 | 78% |
| 9 | Constr of Cement Concrete Roads | 13 | 0 | 12 | 0 | 0.16 | 0.07 | 46% |
| 10 | Construction of NADEP/Vermi Compost Pit | 11 | 0 | 8 | 0 | 0.02 | 0.02 | 83% |
| 11 | Construction of Check Dam/Stop Dam | 10 | 1 | 6 | 2 | 0.21 | 0.14 | 68% |
| 12 | Construction of Recharge Pits | 9 | 0 | 0 | 0 | 0.03 | 0.01 | 34% |
| 13 | Land Development | 7 | 1 | 4 | 0 | 0.32 | 0.15 | 46% |
| 14 | Solid and Liquid Waste Management | 6 | 0 | 4 | 1 | 0.02 | 0.01 | 59% |
| 15 | Farm Pond | 6 | 0 | 3 | 1 | 0.06 | 0.03 | 46% |
| 16 | Construction of Trench | 4 | 0 | 3 | 0 | 0.20 | 0.15 | 73% |
| 17 | Construction of Tank | 3 | 0 | 1 | 0 | 0.05 | 0.04 | 78% |
| 18 | Boulder Check/Gully Plug | 3 | 0 | 3 | 0 | 0.10 | 0.07 | 67% |
| 19 | Culvert | 3 | 0 | 1 | 0 | 0.08 | 0.08 | 100% |
| 20 | Renovation of traditional water bodies | 3 | 0 | 3 | 0 | 0.11 | 0.07 | 68% |
| 21 | Construction of Percolation Tank | 2 | 0 | 0 | 1 | 0.01 | 0.00 | 0% |
| 22 | Construction of Fish Drying Infrastructure | 2 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 23 | Constr of Aganwadi | 1 | 0 | 0 | 0 | 0.05 | 0.03 | 65% |
| 24 | Construction of Crematorium | 1 | 0 | 1 | 0 | 0.03 | 0.03 | 98% |
| 25 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 0 | 0.01 | 0.00 | 0% |
| Total | 515 | 3 | 411 | 9 | 5.07 | 3.33 |