| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 243 | 5 | 236 | 1 | 0.46 | 0.44 | 95% |
| 2 | Construction of Bund | 234 | 0 | 160 | 18 | 20.70 | 0.51 | 3% |
| 3 | Construction of Toilets | 50 | 0 | 38 | 4 | 0.13 | 0.11 | 86% |
| 4 | Constr of Cement Concrete Roads | 28 | 0 | 17 | 3 | 0.10 | 0.10 | 99% |
| 5 | Construction of NADEP/Vermi Compost Pit | 25 | 0 | 18 | 6 | 0.03 | 0.02 | 82% |
| 6 | Land Development | 18 | 0 | 6 | 3 | 0.30 | 0.13 | 44% |
| 7 | Construction of Road and Culvert | 18 | 1 | 13 | 0 | 0.46 | 0.47 | 103% |
| 8 | Solid and Liquid Waste Management | 17 | 0 | 8 | 8 | 0.03 | 0.03 | 93% |
| 9 | Works for Flood Control and Protection | 15 | 0 | 12 | 1 | 0.65 | 0.56 | 86% |
| 10 | Plantation | 10 | 2 | 5 | 1 | 0.17 | 0.04 | 24% |
| 11 | Construction of Check Dam/Stop Dam | 9 | 0 | 7 | 0 | 0.10 | 0.06 | 58% |
| 12 | Construction of Trench | 7 | 0 | 6 | 0 | 0.00 | 0.06 | 0% |
| 13 | Farm Pond | 4 | 0 | 4 | 0 | 0.13 | 0.11 | 83% |
| 14 | Well Recharge | 4 | 0 | 4 | 0 | 0.01 | 0.01 | 99% |
| 15 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 3 | 0 | 1 | 2 | 0.05 | 0.05 | 101% |
| 16 | Construction of Tank | 3 | 0 | 2 | 0 | 0.04 | 0.03 | 89% |
| 17 | Construction of Fish Drying Infrastructure | 2 | 0 | 2 | 0 | 0.08 | 0.04 | 47% |
| 18 | Repair & maint of Pond/ Tank | 2 | 0 | 2 | 0 | 0.18 | 0.16 | 89% |
| 19 | Roof Water Harvesting on gov/panchayat bldg | 2 | 0 | 1 | 1 | 0.00 | 0.00 | 129% |
| 20 | Fish Culture | 1 | 0 | 1 | 0 | 0.03 | 0.02 | 73% |
| 21 | Poultry Shelter | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 22 | Renovation of traditional water bodies | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 23 | Cattle Shed | 1 | 0 | 0 | 1 | 0.01 | 0.00 | 0% |
| Total | 698 | 8 | 543 | 50 | 23.67 | 2.96 |