MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Overall

Rollup last refreshed: 2026-08-27 14:06:46.546602 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 376 10 324 0 71.32 64.43
90%
2 Construction of Check Dam/Stop Dam 59 0 42 16 91.49 68.51
75%
3 Construction of Bund 55 0 41 14 22.27 14.89
67%
4 Construction of Toilets 55 0 55 0 5.97 5.80
97%
5 Construction of Well 35 1 26 5 73.87 53.71
73%
6 Repair & maint of Water Harvesting Structures 26 0 15 7 11.62 4.47
38%
7 Constr of Cement Concrete Roads 18 0 15 0 26.85 18.88
70%
8 Construction of NADEP/Vermi Compost Pit 15 0 1 5 2.01 0.24
12%
9 Construction of Trench 12 0 10 1 56.31 38.48
68%
10 Farm Pond 12 0 8 0 22.70 16.90
74%
11 Plantation 12 0 6 6 48.51 3.41
7%
12 Well Recharge 9 0 1 0 4.20 3.95
94%
13 Construction of Tank 6 0 2 4 1.61 0.14
9%
14 Land Development 4 0 3 0 5.02 3.14
63%
15 Construction of Road and Culvert 3 0 3 0 14.26 12.43
87%
16 Boulder Check/Gully Plug 2 0 1 0 1.06 0.25
24%
17 Construction of Percolation Tank 2 0 1 1 19.95 4.98
25%
18 Construction of Play field 2 0 1 0 5.40 1.66
31%
19 Repair & maint of Percolation Tank 2 0 1 0 1.60 0.42
26%
20 Repair & maint of Pond/ Tank 2 0 0 1 0.53 0.00
1%
21 Constr of Aganwadi 1 0 0 1 0.00 0.00
0%
22 Works for Flood Control and Protection 1 0 0 1 0.45 0.00
0%
23 Constr of GP Bhawan 1 0 1 0 14.85 5.72
39%
24 Constr of Gabion 1 0 1 0 4.98 4.42
89%
25 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0 1 0 4.80 4.69
98%
26 Construction of Crematorium 1 0 1 0 1.80 1.80
100%
Total 713 11 560 62 513.45 333.33
All 26 rows (zero-value rows hidden) ⇩ Export to Excel