MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Overall

Rollup last refreshed: 2026-10-16 08:36:19.743515 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 237 12 205 1 0.42 0.32
76%
2 Construction of Toilets 161 0 131 2 0.14 0.06
47%
3 Well Recharge 75 2 18 10 0.62 0.47
76%
4 Plantation 67 2 9 4 0.55 0.23
41%
5 Constr of Gabion 59 0 47 1 0.13 0.11
87%
6 Construction of Check Dam/Stop Dam 53 0 24 28 1.17 0.87
75%
7 Construction of Trench 37 0 19 12 0.97 0.70
72%
8 Construction of NADEP/Vermi Compost Pit 36 0 19 5 0.03 0.00
10%
9 Construction of Well 33 1 21 8 0.62 0.41
66%
10 Land Development 23 0 5 7 0.08 0.02
19%
11 Construction of Road and Culvert 20 0 8 9 0.57 0.44
79%
12 Cattle Shed 18 0 13 0 0.09 0.07
81%
13 Farm Pond 15 1 9 0 0.06 0.07
114%
14 Constr of Cement Concrete Roads 15 0 7 7 0.32 0.19
58%
15 Construction of Bund 11 0 4 4 0.03 0.03
83%
16 Construction of Percolation Tank 11 0 4 2 0.15 0.09
60%
17 Construction of Tank 9 0 6 3 0.21 0.16
76%
18 Solid and Liquid Waste Management 9 0 1 7 0.01 0.00
4%
19 Repair & Maint of Check Dam/Stop Dam 8 0 3 5 0.12 0.11
88%
20 Construction of Recharge Pits 4 0 0 4 0.00 0.00
0%
21 Terracing 4 1 2 1 0.22 0.09
42%
22 Construction of building/workshed for SHG 3 0 0 3 0.00 0.00
0%
23 Boulder Check/Gully Plug 2 0 0 2 0.00 0.00
0%
24 Constr of Aganwadi 2 0 1 0 0.10 0.02
19%
25 Repair & Maint of Bund 1 0 0 1 0.00 0.00
0%
26 Construction of Other Community Building/Assets 1 0 0 0 0.02 0.00
0%
27 Repair & maint of Pond/ Tank 1 0 0 0 0.02 0.02
67%
28 Repair & maint of Road 1 1 0 0 0.00 0.00
100%
29 Repair & maint of Water Harvesting Structures 1 0 0 1 0.00 0.00
0%
30 Community Sanitary Complex 1 0 1 0 0.00 0.00
94%
31 Construction of Embankment 1 0 1 0 0.00 0.01
0%
32 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0 1 0 0.01 0.00
46%
33 Construction of Crematorium 1 0 1 0 0.02 0.02
98%
34 Constr of Compound wall 1 0 0 1 0.00 0.00
0%
Total 922 20 560 128 6.70 4.53
All 34 rows (zero-value rows hidden) ⇩ Export to Excel