MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Overall

Rollup last refreshed: 2026-08-20 07:27:54.710413 · figures are real, from combined_work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 92,788 1,807 84,673 1,801 164.23 141.61
86%
2 Construction of Well 32,801 1,048 22,195 2,809 453.83 288.50
64%
3 Plantation 28,009 3,760 14,719 3,552 313.62 85.97
27%
4 Construction of Check Dam/Stop Dam 20,198 254 11,722 3,529 650.06 325.65
50%
5 Construction of Recharge Pits 10,221 52 6,720 2,883 20.95 11.94
57%
6 Construction of Bund 8,783 16 4,443 2,596 53.33 30.11
57%
7 Construction of Toilets 8,373 14 7,428 202 33.87 23.72
70%
8 Land Development 7,686 49 5,209 1,106 66.35 22.33
34%
9 Constr of Cement Concrete Roads 6,177 152 4,377 687 117.25 74.25
63%
10 Construction of NADEP/Vermi Compost Pit 6,170 7 2,735 2,830 13.38 9.16
69%
11 Well Recharge 5,172 133 1,368 491 27.80 17.93
65%
12 Farm Pond 5,162 191 2,547 575 68.56 33.34
49%
13 Construction of Trench 3,851 26 2,628 587 87.36 68.62
79%
14 Boulder Check/Gully Plug 2,430 32 1,094 1,091 26.27 16.05
61%
15 Construction of Road and Culvert 2,390 21 1,779 278 166.13 110.65
67%
16 Construction of Percolation Tank 2,335 68 1,168 675 112.75 87.12
77%
17 Construction of Tank 2,071 309 475 448 187.51 117.16
63%
18 Poultry Shelter 1,716 19 841 527 10.76 7.03
65%
19 Repair & maint of Pond/ Tank 1,017 32 534 333 7.65 3.86
51%
20 Constr of Aganwadi 568 17 332 140 16.97 8.19
48%
21 Cattle Shed 554 64 154 141 4.05 2.85
70%
22 Construction of Crematorium 432 10 279 30 7.10 4.38
62%
23 Goat Shelter 421 7 105 237 0.95 0.43
45%
24 Constr of Gabion 416 18 140 245 3.87 2.23
58%
25 Solid and Liquid Waste Management 373 2 246 15 2.72 1.13
42%
26 Renovation of traditional water bodies 319 0 261 4 2.05 1.10
54%
27 Constr of GP Bhawan 287 6 196 64 22.62 15.33
68%
28 Terracing 274 1 133 70 1.47 0.90
61%
29 Underground Dyke for Ground Water Recharge 234 1 143 70 2.74 2.46
90%
30 Culvert 218 4 128 15 4.36 2.87
66%
31 Repair & maint of Percolation Tank 183 7 76 77 6.95 5.29
76%
32 Community Sanitary Complex 176 6 146 19 1.07 0.67
62%
33 Constr of Kitchen Shed 173 0 72 95 0.35 0.12
35%
34 Construction of Play field 154 2 93 28 3.51 1.85
53%
35 Repair & Maint of Check Dam/Stop Dam 136 2 50 72 3.33 2.04
61%
36 Construction of Embankment 125 3 58 53 5.84 4.10
70%
37 Repair & maint of Road 106 0 46 45 3.19 2.27
71%
38 Repair & maint of Water Harvesting Structures 101 0 29 50 2.24 0.83
37%
39 Roof Water Harvesting on gov/panchayat bldg 84 3 14 38 0.59 0.34
58%
40 Grass Land Development 74 0 42 7 0.43 0.19
44%
41 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 56 1 22 20 0.60 0.29
48%
42 Nursery Development 56 0 21 27 0.88 0.19
22%
43 Constr of Compound wall 37 0 11 22 0.09 0.03
36%
44 Construction of Spur 31 0 10 14 0.43 0.29
69%
45 Repair & Maint of Community infrastructure 28 0 17 6 0.94 0.58
62%
46 Other Works 25 0 7 5 0.11 0.06
53%
47 Repair & Maint of Bund 25 0 9 15 0.44 0.39
89%
48 Constr of Food Grain storage 25 2 8 15 0.16 0.09
59%
49 Construction of Canal 13 1 0 6 0.25 0.11
44%
50 Piggery Shelter 12 0 4 6 0.10 0.02
15%
51 Construction of Other Community Building/Assets 11 0 6 2 0.50 0.13
27%
52 Bio-Fertilizer 10 0 3 1 0.07 0.02
27%
53 Deepening / Desilting of Flood Channels 10 0 7 1 1.20 0.41
34%
54 Works for Flood Control and Protection 6 0 3 2 0.05 0.04
76%
55 Strengthening of Embankment 4 0 3 0 0.28 0.22
79%
56 Bio-gas plant 4 0 0 1 0.01 0.00
0%
57 Construction of building/workshed for SHG 3 0 1 2 0.06 0.05
82%
58 Construction of Village Haats 3 0 1 2 0.02 0.02
95%
59 Lift Irrigation 2 0 1 0 0.07 0.02
30%
60 Repaire and Maint of NADEP/Vermi Compost Pit 2 0 0 2 0.00 0.00
0%
61 Construction of Fish Drying Infrastructure 2 1 1 0 0.06 0.03
47%
62 Repair & maint of Gully Plugs 2 0 2 0 0.03 0.03
89%
63 Repair & Maint of Canal 1 0 1 0 0.05 0.04
73%
64 Lining of Canal 1 0 1 0 0.05 0.04
81%
Total 2,53,127 8,148 1,79,537 28,664 2,684.50 1,537.63
All 64 rows (zero-value rows hidden) ⇩ Export to Excel